Installation av rör- och värmeväxlarsystem för spillvärmeåtervinning vid Boliden Rönnskär

Rönnskärsverken in Skelleftehamn is a smeltery owned by Boliden. Rönnskär receives raw materials from Boliden´s mines and electronic materials. The metals that are mined at Rönnskär are mainly copper, lead and zinc, as well the precious metals silver and gold, where copper is the largest volume of t...

Full description

Bibliographic Details
Main Author: Lindberg, Daniel
Format: Others
Language:Swedish
Published: Luleå tekniska universitet, Institutionen för teknikvetenskap och matematik 2021
Subjects:
Online Access:http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-85978
id ndltd-UPSALLA1-oai-DiVA.org-ltu-85978
record_format oai_dc
spelling ndltd-UPSALLA1-oai-DiVA.org-ltu-859782021-06-30T05:24:21ZInstallation av rör- och värmeväxlarsystem för spillvärmeåtervinning vid Boliden RönnskärsweLindberg, DanielLuleå tekniska universitet, Institutionen för teknikvetenskap och matematik2021Rör installationSpillvärmeEnergiåtervinningMechanical EngineeringMaskinteknikRönnskärsverken in Skelleftehamn is a smeltery owned by Boliden. Rönnskär receives raw materials from Boliden´s mines and electronic materials. The metals that are mined at Rönnskär are mainly copper, lead and zinc, as well the precious metals silver and gold, where copper is the largest volume of the metal production. Today Rönnskär meet the heat demand with waste heat from Rönnskär´s processes in its internal heating network and Skelleftehamn and Ursviken. During the colder days or accidents, Rönnskär´s energy central fires oil to maintain the steam demand for condensation of steam to the district heating network. Oil fired steam production is something that Rönnskärsverket wants to reduce.    This Report is a pre study that will present a future potential solution to utilize slutabs-heat for SO2 (l) production, thereby release intermediate circuit heat to the district heating network. In the pre study pipes, pumps, heat exchangers were dimensioned, and estimated installations cost was calculated. During the pre-study, drawings for installation of the pipelines was designed.    The pre study showed that is was possible to install pipelines and heat exchangers to make use of the slutabs-heat for SO2 (l) production, thereby release the intermediate circuit heat to the district heating network. The pre study also showed that the oil consumption in the oil-fired steam boilers would be reduced by 660 m3 during the estimate period and the payback time on the investment cost is 4 years. Student thesisinfo:eu-repo/semantics/bachelorThesistexthttp://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-85978application/pdfinfo:eu-repo/semantics/openAccess
collection NDLTD
language Swedish
format Others
sources NDLTD
topic Rör installation
Spillvärme
Energiåtervinning
Mechanical Engineering
Maskinteknik
spellingShingle Rör installation
Spillvärme
Energiåtervinning
Mechanical Engineering
Maskinteknik
Lindberg, Daniel
Installation av rör- och värmeväxlarsystem för spillvärmeåtervinning vid Boliden Rönnskär
description Rönnskärsverken in Skelleftehamn is a smeltery owned by Boliden. Rönnskär receives raw materials from Boliden´s mines and electronic materials. The metals that are mined at Rönnskär are mainly copper, lead and zinc, as well the precious metals silver and gold, where copper is the largest volume of the metal production. Today Rönnskär meet the heat demand with waste heat from Rönnskär´s processes in its internal heating network and Skelleftehamn and Ursviken. During the colder days or accidents, Rönnskär´s energy central fires oil to maintain the steam demand for condensation of steam to the district heating network. Oil fired steam production is something that Rönnskärsverket wants to reduce.    This Report is a pre study that will present a future potential solution to utilize slutabs-heat for SO2 (l) production, thereby release intermediate circuit heat to the district heating network. In the pre study pipes, pumps, heat exchangers were dimensioned, and estimated installations cost was calculated. During the pre-study, drawings for installation of the pipelines was designed.    The pre study showed that is was possible to install pipelines and heat exchangers to make use of the slutabs-heat for SO2 (l) production, thereby release the intermediate circuit heat to the district heating network. The pre study also showed that the oil consumption in the oil-fired steam boilers would be reduced by 660 m3 during the estimate period and the payback time on the investment cost is 4 years.
author Lindberg, Daniel
author_facet Lindberg, Daniel
author_sort Lindberg, Daniel
title Installation av rör- och värmeväxlarsystem för spillvärmeåtervinning vid Boliden Rönnskär
title_short Installation av rör- och värmeväxlarsystem för spillvärmeåtervinning vid Boliden Rönnskär
title_full Installation av rör- och värmeväxlarsystem för spillvärmeåtervinning vid Boliden Rönnskär
title_fullStr Installation av rör- och värmeväxlarsystem för spillvärmeåtervinning vid Boliden Rönnskär
title_full_unstemmed Installation av rör- och värmeväxlarsystem för spillvärmeåtervinning vid Boliden Rönnskär
title_sort installation av rör- och värmeväxlarsystem för spillvärmeåtervinning vid boliden rönnskär
publisher Luleå tekniska universitet, Institutionen för teknikvetenskap och matematik
publishDate 2021
url http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-85978
work_keys_str_mv AT lindbergdaniel installationavrorochvarmevaxlarsystemforspillvarmeatervinningvidbolidenronnskar
_version_ 1719415011177136128