Analys av en Aluminiumprofils Flödesväg : Reducerad Kapitalbindning och Kapitalkostnad på Profilgruppen Extrusions AB

This bachelor thesis was composed by the initiative of a large aluminium profile producer in southern Sweden. Together, the authors and the company analyzed and mapped the current production flow of a selected item. The lead time and total output for a selected article was determined in order to exa...

Full description

Bibliographic Details
Main Authors: Wennberg, Johannes, Mlivic, Ajdin, Melgén, Ville
Format: Others
Language:Swedish
Published: Linnéuniversitetet, Institutionen för ekonomistyrning och logistik (ELO) 2018
Subjects:
Online Access:http://urn.kb.se/resolve?urn=urn:nbn:se:lnu:diva-76125
id ndltd-UPSALLA1-oai-DiVA.org-lnu-76125
record_format oai_dc
spelling ndltd-UPSALLA1-oai-DiVA.org-lnu-761252018-06-26T06:09:33ZAnalys av en Aluminiumprofils Flödesväg : Reducerad Kapitalbindning och Kapitalkostnad på Profilgruppen Extrusions ABsweWennberg, JohannesMlivic, AjdinMelgén, VilleLinnéuniversitetet, Institutionen för ekonomistyrning och logistik (ELO)Linnéuniversitetet, Institutionen för ekonomistyrning och logistik (ELO)Linnéuniversitetet, Institutionen för ekonomistyrning och logistik (ELO)2018Tied up capitalcosts of capitalitem flowlead time.Kapitalbindningkapitalkostnadflödesvägledtid.Business AdministrationFöretagsekonomiThis bachelor thesis was composed by the initiative of a large aluminium profile producer in southern Sweden. Together, the authors and the company analyzed and mapped the current production flow of a selected item. The lead time and total output for a selected article was determined in order to examine the possibility of reducing the amount of tied up capital and related costs. Findings showed that reducing tied up capital and associated costs could be done through adjustment of production layout, production efficiency as well as alterations of produced quantities. By combining these three proposals for improvement, an overall recommendation for future course of action for the company was composed. Bakgrund: Det problem som utgör grunden för uppsatsen är förankrat i ProfilGruppens osäkerhet gällande vart i en artikels flödesväg kapitalbindning uppstår. Flödesvägar anses kunna ha onödiga delprocesser, samtidigt som använd lager- samt produktionskvantitet inte är teoretiskt förankrad. Potentiellt skulle kapitalbindning och kapitalkostnad kunna reduceras genom analys av dessa aspekter.   Syfte: Uppsatsens syfte är att utreda förbättringsmöjligheter i termer av reducerad kapitalbindning och kapitalkostnad inom en typartikels flödesväg.   Metod: Studien följer en kombination av de kvalitativa och kvantitativa forskningsstrategierna. Arbetet präglas av ett positivistiskt synsätt, eftersom målet är att nå en kvantitativ reduktion av företagets kostnader. Samtidigt är uppsatsen en fallstudie, en design tätt kopplad till kvalitativ forskning. Studien utmärks av ett ständig förhållande till teoretisk relevans, i syfte att kunna applicera genomförd analys på andra företag försatta i liknande situation.    Slutsats: Forskningens resultat visar att tre av de fyra analyserade förbättringsförslagen är av intresse att implementera i företagets verksamhet. Genom att kombinera samtliga förslag till en sammanställd rekommendation presenteras en övergripande framtida handlingsplan för ProfilGruppen att vidta. Student thesisinfo:eu-repo/semantics/bachelorThesistexthttp://urn.kb.se/resolve?urn=urn:nbn:se:lnu:diva-76125application/pdfinfo:eu-repo/semantics/openAccess
collection NDLTD
language Swedish
format Others
sources NDLTD
topic Tied up capital
costs of capital
item flow
lead time.
Kapitalbindning
kapitalkostnad
flödesväg
ledtid.
Business Administration
Företagsekonomi
spellingShingle Tied up capital
costs of capital
item flow
lead time.
Kapitalbindning
kapitalkostnad
flödesväg
ledtid.
Business Administration
Företagsekonomi
Wennberg, Johannes
Mlivic, Ajdin
Melgén, Ville
Analys av en Aluminiumprofils Flödesväg : Reducerad Kapitalbindning och Kapitalkostnad på Profilgruppen Extrusions AB
description This bachelor thesis was composed by the initiative of a large aluminium profile producer in southern Sweden. Together, the authors and the company analyzed and mapped the current production flow of a selected item. The lead time and total output for a selected article was determined in order to examine the possibility of reducing the amount of tied up capital and related costs. Findings showed that reducing tied up capital and associated costs could be done through adjustment of production layout, production efficiency as well as alterations of produced quantities. By combining these three proposals for improvement, an overall recommendation for future course of action for the company was composed. === Bakgrund: Det problem som utgör grunden för uppsatsen är förankrat i ProfilGruppens osäkerhet gällande vart i en artikels flödesväg kapitalbindning uppstår. Flödesvägar anses kunna ha onödiga delprocesser, samtidigt som använd lager- samt produktionskvantitet inte är teoretiskt förankrad. Potentiellt skulle kapitalbindning och kapitalkostnad kunna reduceras genom analys av dessa aspekter.   Syfte: Uppsatsens syfte är att utreda förbättringsmöjligheter i termer av reducerad kapitalbindning och kapitalkostnad inom en typartikels flödesväg.   Metod: Studien följer en kombination av de kvalitativa och kvantitativa forskningsstrategierna. Arbetet präglas av ett positivistiskt synsätt, eftersom målet är att nå en kvantitativ reduktion av företagets kostnader. Samtidigt är uppsatsen en fallstudie, en design tätt kopplad till kvalitativ forskning. Studien utmärks av ett ständig förhållande till teoretisk relevans, i syfte att kunna applicera genomförd analys på andra företag försatta i liknande situation.    Slutsats: Forskningens resultat visar att tre av de fyra analyserade förbättringsförslagen är av intresse att implementera i företagets verksamhet. Genom att kombinera samtliga förslag till en sammanställd rekommendation presenteras en övergripande framtida handlingsplan för ProfilGruppen att vidta.
author Wennberg, Johannes
Mlivic, Ajdin
Melgén, Ville
author_facet Wennberg, Johannes
Mlivic, Ajdin
Melgén, Ville
author_sort Wennberg, Johannes
title Analys av en Aluminiumprofils Flödesväg : Reducerad Kapitalbindning och Kapitalkostnad på Profilgruppen Extrusions AB
title_short Analys av en Aluminiumprofils Flödesväg : Reducerad Kapitalbindning och Kapitalkostnad på Profilgruppen Extrusions AB
title_full Analys av en Aluminiumprofils Flödesväg : Reducerad Kapitalbindning och Kapitalkostnad på Profilgruppen Extrusions AB
title_fullStr Analys av en Aluminiumprofils Flödesväg : Reducerad Kapitalbindning och Kapitalkostnad på Profilgruppen Extrusions AB
title_full_unstemmed Analys av en Aluminiumprofils Flödesväg : Reducerad Kapitalbindning och Kapitalkostnad på Profilgruppen Extrusions AB
title_sort analys av en aluminiumprofils flödesväg : reducerad kapitalbindning och kapitalkostnad på profilgruppen extrusions ab
publisher Linnéuniversitetet, Institutionen för ekonomistyrning och logistik (ELO)
publishDate 2018
url http://urn.kb.se/resolve?urn=urn:nbn:se:lnu:diva-76125
work_keys_str_mv AT wennbergjohannes analysavenaluminiumprofilsflodesvagreduceradkapitalbindningochkapitalkostnadpaprofilgruppenextrusionsab
AT mlivicajdin analysavenaluminiumprofilsflodesvagreduceradkapitalbindningochkapitalkostnadpaprofilgruppenextrusionsab
AT melgenville analysavenaluminiumprofilsflodesvagreduceradkapitalbindningochkapitalkostnadpaprofilgruppenextrusionsab
_version_ 1718707768967299072