Short Term Regulation in Hydropower Plants using Batteries : A case study of hydropower pants in lower Oreälven river
Hydropower is one of the oldest renewable energy (RE) sources and constitutes a major share in the Swedish electricity mix. Though hydropower is renewable, there exist some issues pertaining to the local aquatic conditions. With more environmental laws being implemented, regulating the use and manag...
Main Authors: | Baskar, Ashish Guhan, Sridhar, Araavind |
---|---|
Format: | Others |
Language: | English |
Published: |
KTH, Skolan för industriell teknik och management (ITM)
2020
|
Subjects: | |
Online Access: | http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-289407 |
Similar Items
-
START AND STOP COSTS FOR SECONDARY REGULATION OF FORTUM HYDROPOWER PLANTS
by: Ali, Abdi
Published: (2015) -
Intelligent hydropower : Making hydropower more efficient by utilizing machine learning for inflow forecasting
by: Claesson, Jakob, et al.
Published: (2020) -
Operation of battery energy storage system for frequency control of hydropower operated in island mode
by: Hallblad, Amanda
Published: (2020) -
Battery Equalization Control Based on the Shunt Transistor Method
by: Gallardo-Lozano Javier, et al.
Published: (2014-12-01) -
Battery Crush Test Procedures in Standards and Regulation: Need for Augmentation and Harmonisation
by: Bhavya Kotak, et al.
Published: (2021-09-01)