Short Term Regulation in Hydropower Plants using Batteries : A case study of hydropower pants in lower Oreälven river
Hydropower is one of the oldest renewable energy (RE) sources and constitutes a major share in the Swedish electricity mix. Though hydropower is renewable, there exist some issues pertaining to the local aquatic conditions. With more environmental laws being implemented, regulating the use and manag...
Main Authors: | , |
---|---|
Format: | Others |
Language: | English |
Published: |
KTH, Skolan för industriell teknik och management (ITM)
2020
|
Subjects: | |
Online Access: | http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-289407 |
id |
ndltd-UPSALLA1-oai-DiVA.org-kth-289407 |
---|---|
record_format |
oai_dc |
collection |
NDLTD |
language |
English |
format |
Others
|
sources |
NDLTD |
topic |
Short Term Regulation Hydropower Plant Battery Energy Storage System Mixed Integer Linear Programming Machine Learning Second Life of The Battery Kortsiktig reglering vattenkraftverk batterilagringssystem linjär programmering maskininlärning återanvändning av batterier Engineering and Technology Teknik och teknologier |
spellingShingle |
Short Term Regulation Hydropower Plant Battery Energy Storage System Mixed Integer Linear Programming Machine Learning Second Life of The Battery Kortsiktig reglering vattenkraftverk batterilagringssystem linjär programmering maskininlärning återanvändning av batterier Engineering and Technology Teknik och teknologier Baskar, Ashish Guhan Sridhar, Araavind Short Term Regulation in Hydropower Plants using Batteries : A case study of hydropower pants in lower Oreälven river |
description |
Hydropower is one of the oldest renewable energy (RE) sources and constitutes a major share in the Swedish electricity mix. Though hydropower is renewable, there exist some issues pertaining to the local aquatic conditions. With more environmental laws being implemented, regulating the use and management of water is jeopardizing the flexibility of hydropower plants. The decided national plan for new environmental conditions in Sweden is expected to start being implemented in 2025 and more restrictions are expected. Analysing a battery energy storage system's capabilities plants may improve flexibility in hydropower plant operation. This thesis is focused on the short-term regulation in lower Oreälven river where the hydropower plants Skattungbyn, Unnån and Hansjö are located. The combined hydropower plant and battery system is simulated being employed in the day-ahead market and a techno-economic optimization of the combined system is performed. The combined system's operation is modelled using Mixed Integer Linear Programming. The future electricity market analysis is modelled using Machine Learning techniques. Three different electricity market scenarios were developed based on different Swedish nuclear energy targets for 2040 to capture the future. The first scenario developed complies with the Swedish energy target of 100 % renewable production in 2040. The second scenario has still two nuclear power plants in operation by 2040 and the third scenario has the same nuclear capacity as of 2020. It is observed from the results that with the current battery costs (~3,6 Million SEK/MWh), the implementation of a battery system for the short term regulation of the combined battery/hydropower system is not profitable and the cost of battery needs to be less than 0,5 Million SEK/MWh to make it profitable. The thesis also discusses the possibility of utilizing batteries’ second life and the techno-economic analysis of their performance. === Vattenkraft är en av de allra äldsta förnybara energikällorna och utgör idag en väsentlig del av Sveriges energimix. Trots att vattenkraft är förnybar, har den lett till vissa utmaningar i den lokala vattenmiljön. Som en följd av att fler miljölagar har implementerats för att reglera nyttjandet av vattendrag och sjöar, minskar flexibiliteten i vattenkraftproduktionen. Den av den svenska regeringen i juni 2020 beslutade nationella planen för miljöanpassning av vattenkraften i Sverige, förväntas börja genomföras med start 2025 och tros då resultera i fler flexibilitetsbegränsningar. Genom att analysera driften av batteriers energilagringssystem kombinerade med vattenkraftverk, bedöms flexibiliteten i sådana kombinerade system kunna ökas. Denna studie fokuserar på den kortsiktiga regleringen av nedre Oreälven med vattenkraftverken Skattungbyn, Unnån och Hansjö. En kombination av vattenkraftverken med batterisystem simuleras mot spot-marknaden och en teknisk-ekonomisk optimering av det kombinerade systemet utförs. Driften av det kombinerade systemet modelleras med linjärprogrammering och den framtida analysen av elmarknaden modelleras med maskininlärningstekniker. Tre olika scenarier för elmarknaden utvecklades baserade på målen för den svenska kärnkraften år 2040. Det första scenariot som utvecklades är i linje med det svenska energimålet om 100 % förnybar produktion till 2040. Det andra scenariot utvecklades med två kärnkraftverk fortfarande i drift 2040 och det tredje scenariot med samma kärnkraftskapacitet som 2020. Från resultaten kan särskilt noteras att med nuvarande batterikostnader (~3,6 miljoner SEK/MWh) kommer införandet av batterier för att kortsiktigt reglera vattenkraftverken inte att vara lönsamt om inte batterikostnaden reduceras till som högst 0,5 miljoner SEK/MWh. Denna studie diskuterar även möjligheterna att använda andrahandsbatterier samt en teknisk-ekonomisk analys för dess prestanda. |
author |
Baskar, Ashish Guhan Sridhar, Araavind |
author_facet |
Baskar, Ashish Guhan Sridhar, Araavind |
author_sort |
Baskar, Ashish Guhan |
title |
Short Term Regulation in Hydropower Plants using Batteries : A case study of hydropower pants in lower Oreälven river |
title_short |
Short Term Regulation in Hydropower Plants using Batteries : A case study of hydropower pants in lower Oreälven river |
title_full |
Short Term Regulation in Hydropower Plants using Batteries : A case study of hydropower pants in lower Oreälven river |
title_fullStr |
Short Term Regulation in Hydropower Plants using Batteries : A case study of hydropower pants in lower Oreälven river |
title_full_unstemmed |
Short Term Regulation in Hydropower Plants using Batteries : A case study of hydropower pants in lower Oreälven river |
title_sort |
short term regulation in hydropower plants using batteries : a case study of hydropower pants in lower oreälven river |
publisher |
KTH, Skolan för industriell teknik och management (ITM) |
publishDate |
2020 |
url |
http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-289407 |
work_keys_str_mv |
AT baskarashishguhan shorttermregulationinhydropowerplantsusingbatteriesacasestudyofhydropowerpantsinlowerorealvenriver AT sridhararaavind shorttermregulationinhydropowerplantsusingbatteriesacasestudyofhydropowerpantsinlowerorealvenriver |
_version_ |
1719374672639819776 |
spelling |
ndltd-UPSALLA1-oai-DiVA.org-kth-2894072021-01-29T05:28:30ZShort Term Regulation in Hydropower Plants using Batteries : A case study of hydropower pants in lower Oreälven riverengBaskar, Ashish GuhanSridhar, AraavindKTH, Skolan för industriell teknik och management (ITM)KTH, Skolan för industriell teknik och management (ITM)2020Short Term RegulationHydropower PlantBattery Energy Storage SystemMixed Integer Linear ProgrammingMachine LearningSecond Life of The BatteryKortsiktig regleringvattenkraftverkbatterilagringssystemlinjär programmeringmaskininlärningåteranvändning av batterierEngineering and TechnologyTeknik och teknologierHydropower is one of the oldest renewable energy (RE) sources and constitutes a major share in the Swedish electricity mix. Though hydropower is renewable, there exist some issues pertaining to the local aquatic conditions. With more environmental laws being implemented, regulating the use and management of water is jeopardizing the flexibility of hydropower plants. The decided national plan for new environmental conditions in Sweden is expected to start being implemented in 2025 and more restrictions are expected. Analysing a battery energy storage system's capabilities plants may improve flexibility in hydropower plant operation. This thesis is focused on the short-term regulation in lower Oreälven river where the hydropower plants Skattungbyn, Unnån and Hansjö are located. The combined hydropower plant and battery system is simulated being employed in the day-ahead market and a techno-economic optimization of the combined system is performed. The combined system's operation is modelled using Mixed Integer Linear Programming. The future electricity market analysis is modelled using Machine Learning techniques. Three different electricity market scenarios were developed based on different Swedish nuclear energy targets for 2040 to capture the future. The first scenario developed complies with the Swedish energy target of 100 % renewable production in 2040. The second scenario has still two nuclear power plants in operation by 2040 and the third scenario has the same nuclear capacity as of 2020. It is observed from the results that with the current battery costs (~3,6 Million SEK/MWh), the implementation of a battery system for the short term regulation of the combined battery/hydropower system is not profitable and the cost of battery needs to be less than 0,5 Million SEK/MWh to make it profitable. The thesis also discusses the possibility of utilizing batteries’ second life and the techno-economic analysis of their performance. Vattenkraft är en av de allra äldsta förnybara energikällorna och utgör idag en väsentlig del av Sveriges energimix. Trots att vattenkraft är förnybar, har den lett till vissa utmaningar i den lokala vattenmiljön. Som en följd av att fler miljölagar har implementerats för att reglera nyttjandet av vattendrag och sjöar, minskar flexibiliteten i vattenkraftproduktionen. Den av den svenska regeringen i juni 2020 beslutade nationella planen för miljöanpassning av vattenkraften i Sverige, förväntas börja genomföras med start 2025 och tros då resultera i fler flexibilitetsbegränsningar. Genom att analysera driften av batteriers energilagringssystem kombinerade med vattenkraftverk, bedöms flexibiliteten i sådana kombinerade system kunna ökas. Denna studie fokuserar på den kortsiktiga regleringen av nedre Oreälven med vattenkraftverken Skattungbyn, Unnån och Hansjö. En kombination av vattenkraftverken med batterisystem simuleras mot spot-marknaden och en teknisk-ekonomisk optimering av det kombinerade systemet utförs. Driften av det kombinerade systemet modelleras med linjärprogrammering och den framtida analysen av elmarknaden modelleras med maskininlärningstekniker. Tre olika scenarier för elmarknaden utvecklades baserade på målen för den svenska kärnkraften år 2040. Det första scenariot som utvecklades är i linje med det svenska energimålet om 100 % förnybar produktion till 2040. Det andra scenariot utvecklades med två kärnkraftverk fortfarande i drift 2040 och det tredje scenariot med samma kärnkraftskapacitet som 2020. Från resultaten kan särskilt noteras att med nuvarande batterikostnader (~3,6 miljoner SEK/MWh) kommer införandet av batterier för att kortsiktigt reglera vattenkraftverken inte att vara lönsamt om inte batterikostnaden reduceras till som högst 0,5 miljoner SEK/MWh. Denna studie diskuterar även möjligheterna att använda andrahandsbatterier samt en teknisk-ekonomisk analys för dess prestanda. Student thesisinfo:eu-repo/semantics/bachelorThesistexthttp://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-289407TRITA-ITM-EX ; 2020:568application/pdfinfo:eu-repo/semantics/openAccess |