4D- och 5D BIM i projekteringsskedet : En studie om 4D- och 5D BIM:s lönsamhet innan upphandlingsskedet
4D- and 5D BIM are used in the design phase of construction projects and mean that a 3D-model of a project is provided with two additional dimensions. 4D is a 3D-model that has a time aspect, while 5D is a 3D-model with both a time aspect and a cost estimate. The 3D-model contains numerous different...
Main Authors: | Skocic, Marko, Erman, Pontus |
---|---|
Format: | Others |
Language: | Swedish |
Published: |
KTH, Byggteknik och design
2020
|
Subjects: | |
Online Access: | http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-287200 |
Similar Items
-
4D BIM ADOPTION : THE INCENTIVES FOR AND BARRIERS TO 4D BIM ADOPTION WITHIN SWEDISH CONSTRUCTION COMPANIES
by: Sediqi, Mujtaba
Published: (2018) -
4D BIM for Construction Logistics Management
by: Kane Whitlock, et al.
Published: (2021-04-01) -
TIDPLANERING AV PROJEKTERINGSSKEDET I BIM-PROJEKT
by: Fredin, Evelina
Published: (2011) -
Användning av 5D-BIM för planering av både industriellt och traditionellt byggande
by: Aho, Joel
Published: (2020) -
Kalkylarbete för byggnadsprojekt med Vico Office : För- och nackdelar med 5D BIM
by: Dilan, Khazan, et al.
Published: (2015)