Short-term deformations in clay under a formwork during the construction of a bridge : A design study
During the casting of a concrete bridge deck, the temporary formwork is causing the underlying ground to deform if a shallow foundation solution is used. There are often demands on the maximum deformation of the superstructure when designing the foundation for the formwork. To keep the deformations...
Main Author: | |
---|---|
Format: | Others |
Language: | English |
Published: |
KTH, Jord- och bergmekanik
2017
|
Subjects: | |
Online Access: | http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-212060 |