Mesh Mounting Concept for a Mechanical Rock Excavation Machine
This report is the result of a Master’s Thesis done at the Machine Design Department at the Royal Institute of Technology. The project was carried out at Svea Teknik AB in cooperation with Atlas Copco Rock Drills AB and the Mining and Rock Excavation division in Örebro. Atlas Copco is currently deve...
Main Author: | |
---|---|
Format: | Others |
Language: | English |
Published: |
KTH, Maskinkonstruktion (Inst.)
2017
|
Subjects: | |
Online Access: | http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-209656 |
id |
ndltd-UPSALLA1-oai-DiVA.org-kth-209656 |
---|---|
record_format |
oai_dc |
collection |
NDLTD |
language |
English |
format |
Others
|
sources |
NDLTD |
topic |
mesh mounting chain link mesh rock reinforcement mine tunnel support nätmontering stängselnät bergförstärkning tunnelförstärkning Mechanical Engineering Maskinteknik |
spellingShingle |
mesh mounting chain link mesh rock reinforcement mine tunnel support nätmontering stängselnät bergförstärkning tunnelförstärkning Mechanical Engineering Maskinteknik Skoog, Elin Mesh Mounting Concept for a Mechanical Rock Excavation Machine |
description |
This report is the result of a Master’s Thesis done at the Machine Design Department at the Royal Institute of Technology. The project was carried out at Svea Teknik AB in cooperation with Atlas Copco Rock Drills AB and the Mining and Rock Excavation division in Örebro. Atlas Copco is currently developing a new TBM for mechanical rock excavation, which have been named the RVM (Remote Vein Miner. When doing the excavation, stresses and cracks are induced in the tunnel walls and roof, why it is necessary to reinforce the tunnel so that is does not collapse. In this case this is done by drilling holes and inserting rock bolts into the tunnel walls, and at the same time clothe the walls with a chain link mesh. The operators that are doing this are working in an unsecured part of the tunnel and are hence exposed to a safety risk. It is therefore of interest to make this mesh mounting procedure automated. The project’s purpose was to develop a design concept for the mesh handling and mounting for the RVM that require less manual hands-on work by the operators, i.e. replacing the existing semi-manual mesh handling to a solution that instead can be automatized and remote controlled. Brainstorming was used to generate 6 different concepts, 4 for the mesh handling and 2 for the bolt handling, which were evaluated in two separate Pugh’s evaluation matrices. The two concepts that was deemed most promising, the bolt carrousel and an arm handling solution for mesh rolls, were further developed. CAD models of the included components and systems were made and used to verify the arm’s range and that it fulfilled all of the constraints related to the spatial limitations on the machine. The hydraulic cylinders were dimensioned with forces obtained from an ADAMS simulation. The final conceptual design did fulfil the requirements, but was considered to be very complex and concerns were made regarding how it would handle the harsh environment in the tunnel. === Denna rapport är resultatet av ett examensarbete som utförts på Institutionen för Maskinkonstruktion på KTH. Projektet gjordes med Svea Teknik AB i samarbete med Atlas Copco Rock Drills AB och deras avdelning för Gruv- och Bergbrytningsteknik i Örebro. Atlas Copco håller för närvarande på att utveckla en ny TBM för mekanisk bergavverkning, som har fått namnet RVM (Remote Vein Miner). När bergavverkning sker så induceras spänningar och sprickor i berget som omger tunneln och det är därför nödvändigt att förstärka tunneln så att den inte rasar samman. I detta fall så sker denna förstärkning genom att borra hål i tunnelväggen och sätta in bergbultar, och samtidigt klä väggarna med ett skyddande nät. När operatörerna utför detta arbete så befinner de sig i en del av tunneln som inte är säkrad och de är således utsatta för säkerhetsrisker. Det är därför av intresse att göra denna nätmonteringsprocess automatiserad. Syftet med detta projekt var att utveckla en konceptkonstruktion för näthanteringen- och monteringen för RVM-maskinen som innebär mindre manuellt arbete av operatörerna, alltså att ersätta den nuvarande semi-manuella näthanteringslösningen med en lösning som istället kan automatiseras och fjärrstyras. Brainstormning användes för att ta fram 6 stycken olika koncept, 4 gällande näthanteringen och 2 för bulthanteringen. Dessa koncept utvärderades i två separata Pugh matriser. De två koncept som ansågs vara de mest lovande, bultkarusellen och en armkonstruktion för hantering av nätrullar, utvecklades vidare. CAD-modeller av de inkluderade komponenterna och systemen gjordes och användes för att verifiera armens räckvidd och att den uppfyllde att hålla sig inom maskinens platsbegränsningar. De hydrauliska cylindrarna dimensionerades utifrån krafter som erhölls från en ADAMS-simulering. Den slutgiltiga konstruktionen uppfyllde alla specificerade krav, men ansågs vara väldigt komplex och det ansågs osäkert hur och om den skulle klara av den mycket tuffa miljön i tunnelgången. |
author |
Skoog, Elin |
author_facet |
Skoog, Elin |
author_sort |
Skoog, Elin |
title |
Mesh Mounting Concept for a Mechanical Rock Excavation Machine |
title_short |
Mesh Mounting Concept for a Mechanical Rock Excavation Machine |
title_full |
Mesh Mounting Concept for a Mechanical Rock Excavation Machine |
title_fullStr |
Mesh Mounting Concept for a Mechanical Rock Excavation Machine |
title_full_unstemmed |
Mesh Mounting Concept for a Mechanical Rock Excavation Machine |
title_sort |
mesh mounting concept for a mechanical rock excavation machine |
publisher |
KTH, Maskinkonstruktion (Inst.) |
publishDate |
2017 |
url |
http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-209656 |
work_keys_str_mv |
AT skoogelin meshmountingconceptforamechanicalrockexcavationmachine AT skoogelin natmonteringskonceptforenmekaniskbergavverkningsmaskin |
_version_ |
1718462010751975424 |
spelling |
ndltd-UPSALLA1-oai-DiVA.org-kth-2096562017-06-22T05:34:59ZMesh Mounting Concept for a Mechanical Rock Excavation MachineengNätmonteringskoncept för en Mekanisk BergavverkningsmaskinSkoog, ElinKTH, Maskinkonstruktion (Inst.)2017mesh mountingchain link meshrock reinforcementmine tunnel supportnätmonteringstängselnätbergförstärkningtunnelförstärkningMechanical EngineeringMaskinteknikThis report is the result of a Master’s Thesis done at the Machine Design Department at the Royal Institute of Technology. The project was carried out at Svea Teknik AB in cooperation with Atlas Copco Rock Drills AB and the Mining and Rock Excavation division in Örebro. Atlas Copco is currently developing a new TBM for mechanical rock excavation, which have been named the RVM (Remote Vein Miner. When doing the excavation, stresses and cracks are induced in the tunnel walls and roof, why it is necessary to reinforce the tunnel so that is does not collapse. In this case this is done by drilling holes and inserting rock bolts into the tunnel walls, and at the same time clothe the walls with a chain link mesh. The operators that are doing this are working in an unsecured part of the tunnel and are hence exposed to a safety risk. It is therefore of interest to make this mesh mounting procedure automated. The project’s purpose was to develop a design concept for the mesh handling and mounting for the RVM that require less manual hands-on work by the operators, i.e. replacing the existing semi-manual mesh handling to a solution that instead can be automatized and remote controlled. Brainstorming was used to generate 6 different concepts, 4 for the mesh handling and 2 for the bolt handling, which were evaluated in two separate Pugh’s evaluation matrices. The two concepts that was deemed most promising, the bolt carrousel and an arm handling solution for mesh rolls, were further developed. CAD models of the included components and systems were made and used to verify the arm’s range and that it fulfilled all of the constraints related to the spatial limitations on the machine. The hydraulic cylinders were dimensioned with forces obtained from an ADAMS simulation. The final conceptual design did fulfil the requirements, but was considered to be very complex and concerns were made regarding how it would handle the harsh environment in the tunnel. Denna rapport är resultatet av ett examensarbete som utförts på Institutionen för Maskinkonstruktion på KTH. Projektet gjordes med Svea Teknik AB i samarbete med Atlas Copco Rock Drills AB och deras avdelning för Gruv- och Bergbrytningsteknik i Örebro. Atlas Copco håller för närvarande på att utveckla en ny TBM för mekanisk bergavverkning, som har fått namnet RVM (Remote Vein Miner). När bergavverkning sker så induceras spänningar och sprickor i berget som omger tunneln och det är därför nödvändigt att förstärka tunneln så att den inte rasar samman. I detta fall så sker denna förstärkning genom att borra hål i tunnelväggen och sätta in bergbultar, och samtidigt klä väggarna med ett skyddande nät. När operatörerna utför detta arbete så befinner de sig i en del av tunneln som inte är säkrad och de är således utsatta för säkerhetsrisker. Det är därför av intresse att göra denna nätmonteringsprocess automatiserad. Syftet med detta projekt var att utveckla en konceptkonstruktion för näthanteringen- och monteringen för RVM-maskinen som innebär mindre manuellt arbete av operatörerna, alltså att ersätta den nuvarande semi-manuella näthanteringslösningen med en lösning som istället kan automatiseras och fjärrstyras. Brainstormning användes för att ta fram 6 stycken olika koncept, 4 gällande näthanteringen och 2 för bulthanteringen. Dessa koncept utvärderades i två separata Pugh matriser. De två koncept som ansågs vara de mest lovande, bultkarusellen och en armkonstruktion för hantering av nätrullar, utvecklades vidare. CAD-modeller av de inkluderade komponenterna och systemen gjordes och användes för att verifiera armens räckvidd och att den uppfyllde att hålla sig inom maskinens platsbegränsningar. De hydrauliska cylindrarna dimensionerades utifrån krafter som erhölls från en ADAMS-simulering. Den slutgiltiga konstruktionen uppfyllde alla specificerade krav, men ansågs vara väldigt komplex och det ansågs osäkert hur och om den skulle klara av den mycket tuffa miljön i tunnelgången. Student thesisinfo:eu-repo/semantics/bachelorThesistexthttp://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-209656MMK 2017:91 MKN 206application/pdfinfo:eu-repo/semantics/openAccess |