Conceptual Design of an UnloadingSystem for Continuous Tracks : How to increase the load capacity of tracks with the use ofhydraulic cylinders

This report presents the result of a Master thesis course done at the Machine Design department at KTH. The thesis was written at the company Svea Teknik in collaboration with the tunnel boring machine manufacturer Atlas Copco. The high longitudinal force needed when the Remote Vein Miner is boring...

Full description

Bibliographic Details
Main Author: Torstensson, Jonas
Format: Others
Language:English
Published: KTH, Maskinkonstruktion (Inst.) 2017
Subjects:
Online Access:http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-209589