Conceptual Design of an UnloadingSystem for Continuous Tracks : How to increase the load capacity of tracks with the use ofhydraulic cylinders
This report presents the result of a Master thesis course done at the Machine Design department at KTH. The thesis was written at the company Svea Teknik in collaboration with the tunnel boring machine manufacturer Atlas Copco. The high longitudinal force needed when the Remote Vein Miner is boring...
Main Author: | |
---|---|
Format: | Others |
Language: | English |
Published: |
KTH, Maskinkonstruktion (Inst.)
2017
|
Subjects: | |
Online Access: | http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-209589 |