Feasibility study of Gisuma Micro-Hydropower plant (Rwanda)
Main Authors: | SHUMBUSHO, Jean-Pierre, Nzirorera, Leonidas |
---|---|
Format: | Others |
Language: | English |
Published: |
KTH, Energisystemanalys
2014
|
Online Access: | http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-159413 |
Similar Items
-
Feasibility study of Gisuma micro-hydropower plant (Rwanda)
by: Nzirorera, Leonidas, et al.
Published: (2015) -
Wetlands management and conservation in Rwanda. Case study: Gikondo Wetland
by: Mbabazi, Scholastica Shumbusho
Published: (2011) -
Sustainability assessment of a micro hydropower plant in Nepal
by: Ramchandra Bhandari, et al.
Published: (2018-02-01) -
A Control Scheme for Variable-Speed Micro-Hydropower Plants
by: Youping Fan, et al.
Published: (2018-11-01) -
Feasibility study of VLH hydro turbine installation at Nam Pung hydropower plant, Thailand
by: Weerapon Nuantong, et al.
Published: (2016-10-01)