Validation of Models for Analysis of the Flexibility of the Swedish Power System
The Swedish parliament has passed a planning framework to increase wind power production and have the annual production of 30 TWh wind power in 2020. The expansion of a continuously varying generation would result in an increased need for the capability of power system to keep the balance between ge...
Main Author: | |
---|---|
Format: | Others |
Language: | English |
Published: |
KTH, Elektriska energisystem
2014
|
Online Access: | http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-153950 |
id |
ndltd-UPSALLA1-oai-DiVA.org-kth-153950 |
---|---|
record_format |
oai_dc |
collection |
NDLTD |
language |
English |
format |
Others
|
sources |
NDLTD |
description |
The Swedish parliament has passed a planning framework to increase wind power production and have the annual production of 30 TWh wind power in 2020. The expansion of a continuously varying generation would result in an increased need for the capability of power system to keep the balance between generation and consumption. Therefore, it is important to study the flexibility of Swedish power system. Two models of Swedish power system are studied in this thesis work. The first model is a model of Swedish hydro power system which has been developed at KTH. The KTH model is formulated as a large linear optimization problem simulated in GAMS platform. It has a detailed representation of large hydro power plants but presents a simple model of electricity market and trading to other areas. The other model is Apollo which is developed by Sweco Company. Apollo is also formulated as an optimization problem and is a market model which uses a simplified model of hydro power system. The objective of this thesis work is to exchange data between the two models in order to compare, validate and if possible improve the models. To exchange data, the inputs and some outputs of Apollo are used as the inputs of KTH model and finally the outputs of KTH model is compared with the corresponding outputs of Apollo. There are some differences between the two models that must be removed in order to exchange data. All of differences except one of them are removed by data adjustment. The different methods that are used to remove those differences are discussed in the report. Due to the remaining difference and different efficiencies in the two models, scenarios cannot be directly transformed from Apollo to the KTH model. Therefore, three methods are introduced as compensation for the remaining differences. After applying those methods the same results can be obtained in the two models. As a result of the work on the data exchange some improvements are implemented in the KTH model and some improvements are identified and proposed for future work. The improvements are toward removing all the differences between the two models and make the models more similar to the real Swedish hydro power system. It is also concluded from the results that the Apollo hydro power schedules are feasible according to KTH model of hydro power system. This shows that Apollo does not overestimate the flexibility of Swedish hydro power system in the tested scenarios. === Riksdagen har beslutat om ett planeringsmål för ökad vindkraftproduktion upp till 30 TWh vindkraft år 2020. En utbygnnad av kontinuerligt varierande produktion skulle medföra ett ökat behov för elsystemets förmåga att balansera produktion och konsumtion. Därför är det viktigt att studera flexibiliteten i det svenska elsystemet. Två modeller av det svenska elsystemet studeras i detta examensarbete. Den första modellen, som är utvecklad på KTH, är en modell av det svenska vattenkraftsystemet. KTH-modellen är formulerad som ett stort linjärt optimeringsproblem som simuleras i GAMS-plattformen. Modellen har en detaljerad representation av större vattenkraftverk, medan modellen av elmarknaden och handeln med andra områden är mycket förenklad. Den andra modellen heter Apollo och är utvecklad av konsultföretaget Sweco. Apollo är också formulerad som ett optimeringsproblem, och är en marknadsmodell som använder en förenklad modell av vattenkraftsystemet. Målsättningen med detta arbete är att utbyta data mellan de två modellerna för att jämföra, validera och om möjligt förbättra de två modellerna. För att utbyta data används indata och vissa utdata från Apollo som indata till KTH-modellen och slutligen jämförs utdata från KTH-modellen med motsvarande utdata från Apollo. Det finns en del skillnader mellan de två modellerna som måste hanteras för att datautbytet ska vara möjligt. Alla skillnader utom en hanteras genom att modifiera data. De olika metoder som används för att hantera dessa skillnader diskuteras i rapporten. På grund av den återstående skillnaden och olika verkningsgrader i de två modellerna så kan inte scenarier överföras direkt från Apollo till KTH-modellen. Därför föreslås tre metoder för att kompensera de återstående skillnaderna. Med hjälp av dessa metoder kan samma resultat erhållas från de två modellerna. Till följd av arbetet med datautbytet har några förbättringar av KTH-modellen implementerats och ytterligare förbättringar har identifierats och föreslagits som framtida arbete. Dessa förbättringar syftar till att ta bort skillnaderna mellan de två modellerna och att göra de modellerna mer lika det verkliga svenska vattenkraftsystemet. En slutsats från projektet är också att de produktionsplaner för vattenkraften som erhålls från Apollo är genomförbara enligt KTH:s modell av vattenkraften. Detta visar att Apollo i de testade scenarierna inte överskattar flexibiliteten i det svenska vattenkraftsystemet. |
author |
Shafiee, Leila |
spellingShingle |
Shafiee, Leila Validation of Models for Analysis of the Flexibility of the Swedish Power System |
author_facet |
Shafiee, Leila |
author_sort |
Shafiee, Leila |
title |
Validation of Models for Analysis of the Flexibility of the Swedish Power System |
title_short |
Validation of Models for Analysis of the Flexibility of the Swedish Power System |
title_full |
Validation of Models for Analysis of the Flexibility of the Swedish Power System |
title_fullStr |
Validation of Models for Analysis of the Flexibility of the Swedish Power System |
title_full_unstemmed |
Validation of Models for Analysis of the Flexibility of the Swedish Power System |
title_sort |
validation of models for analysis of the flexibility of the swedish power system |
publisher |
KTH, Elektriska energisystem |
publishDate |
2014 |
url |
http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-153950 |
work_keys_str_mv |
AT shafieeleila validationofmodelsforanalysisoftheflexibilityoftheswedishpowersystem AT shafieeleila valideringavmodellerforattstuderaflexibilitetenidetsvenskaelsystemet |
_version_ |
1716716501293072384 |
spelling |
ndltd-UPSALLA1-oai-DiVA.org-kth-1539502014-10-11T04:44:56ZValidation of Models for Analysis of the Flexibility of the Swedish Power SystemengValidering av modeller för att studera flexibiliteten i det svenska elsystemetShafiee, LeilaKTH, Elektriska energisystem2014The Swedish parliament has passed a planning framework to increase wind power production and have the annual production of 30 TWh wind power in 2020. The expansion of a continuously varying generation would result in an increased need for the capability of power system to keep the balance between generation and consumption. Therefore, it is important to study the flexibility of Swedish power system. Two models of Swedish power system are studied in this thesis work. The first model is a model of Swedish hydro power system which has been developed at KTH. The KTH model is formulated as a large linear optimization problem simulated in GAMS platform. It has a detailed representation of large hydro power plants but presents a simple model of electricity market and trading to other areas. The other model is Apollo which is developed by Sweco Company. Apollo is also formulated as an optimization problem and is a market model which uses a simplified model of hydro power system. The objective of this thesis work is to exchange data between the two models in order to compare, validate and if possible improve the models. To exchange data, the inputs and some outputs of Apollo are used as the inputs of KTH model and finally the outputs of KTH model is compared with the corresponding outputs of Apollo. There are some differences between the two models that must be removed in order to exchange data. All of differences except one of them are removed by data adjustment. The different methods that are used to remove those differences are discussed in the report. Due to the remaining difference and different efficiencies in the two models, scenarios cannot be directly transformed from Apollo to the KTH model. Therefore, three methods are introduced as compensation for the remaining differences. After applying those methods the same results can be obtained in the two models. As a result of the work on the data exchange some improvements are implemented in the KTH model and some improvements are identified and proposed for future work. The improvements are toward removing all the differences between the two models and make the models more similar to the real Swedish hydro power system. It is also concluded from the results that the Apollo hydro power schedules are feasible according to KTH model of hydro power system. This shows that Apollo does not overestimate the flexibility of Swedish hydro power system in the tested scenarios. Riksdagen har beslutat om ett planeringsmål för ökad vindkraftproduktion upp till 30 TWh vindkraft år 2020. En utbygnnad av kontinuerligt varierande produktion skulle medföra ett ökat behov för elsystemets förmåga att balansera produktion och konsumtion. Därför är det viktigt att studera flexibiliteten i det svenska elsystemet. Två modeller av det svenska elsystemet studeras i detta examensarbete. Den första modellen, som är utvecklad på KTH, är en modell av det svenska vattenkraftsystemet. KTH-modellen är formulerad som ett stort linjärt optimeringsproblem som simuleras i GAMS-plattformen. Modellen har en detaljerad representation av större vattenkraftverk, medan modellen av elmarknaden och handeln med andra områden är mycket förenklad. Den andra modellen heter Apollo och är utvecklad av konsultföretaget Sweco. Apollo är också formulerad som ett optimeringsproblem, och är en marknadsmodell som använder en förenklad modell av vattenkraftsystemet. Målsättningen med detta arbete är att utbyta data mellan de två modellerna för att jämföra, validera och om möjligt förbättra de två modellerna. För att utbyta data används indata och vissa utdata från Apollo som indata till KTH-modellen och slutligen jämförs utdata från KTH-modellen med motsvarande utdata från Apollo. Det finns en del skillnader mellan de två modellerna som måste hanteras för att datautbytet ska vara möjligt. Alla skillnader utom en hanteras genom att modifiera data. De olika metoder som används för att hantera dessa skillnader diskuteras i rapporten. På grund av den återstående skillnaden och olika verkningsgrader i de två modellerna så kan inte scenarier överföras direkt från Apollo till KTH-modellen. Därför föreslås tre metoder för att kompensera de återstående skillnaderna. Med hjälp av dessa metoder kan samma resultat erhållas från de två modellerna. Till följd av arbetet med datautbytet har några förbättringar av KTH-modellen implementerats och ytterligare förbättringar har identifierats och föreslagits som framtida arbete. Dessa förbättringar syftar till att ta bort skillnaderna mellan de två modellerna och att göra de modellerna mer lika det verkliga svenska vattenkraftsystemet. En slutsats från projektet är också att de produktionsplaner för vattenkraften som erhålls från Apollo är genomförbara enligt KTH:s modell av vattenkraften. Detta visar att Apollo i de testade scenarierna inte överskattar flexibiliteten i det svenska vattenkraftsystemet. Student thesisinfo:eu-repo/semantics/bachelorThesistexthttp://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-153950EES Examensarbete / Master Thesis ; XR-EE-EPS 2014:012application/pdfinfo:eu-repo/semantics/openAccess |