An Analysis of the Kitting Process at Electrolux Mariestad
In order to meet goals set by the Electrolux Group, the factory in Mariestad has been changed significantly with the introduction of two new assembly lines. Kitting has been implemented along with a new material replenishment system. Several new products have also been introduced and these three ele...
Main Authors: | Janusson, Dadí, Thorarinsson, Arní V. |
---|---|
Format: | Others |
Language: | English |
Published: |
KTH, Industriell produktion
2011
|
Online Access: | http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-102533 |
Similar Items
-
Ledningsdatabas för beslutsstöd : en studie på Electrolux i Mariestad
by: Eriksson, Mats, et al.
Published: (2003) -
Analysis of impact of process complexity on unbalanced work in assembly process and methods to reduce it : Project undertaken in Electrolux AB Mariestad, under guidance of SWEREA IVF AB
by: Lokhande, Kushal, et al.
Published: (2012) -
Energianalys av äldre flerbostadshus : Kvarter Kommissionären i Mariestad
by: Zayton, Hedro Gabriel, et al.
Published: (2015) -
Energianalys av fastigheten Björnen : Kvarteret Björnen i Mariestad
by: Östanbäck, Kristian
Published: (2015) -
Electrolux Aer : ”Exploring new possibilities in portable air conditioning together with Electrolux and KTH”
by: Selg, Jaan
Published: (2013)