Minimera problem & konflikter i ledningssamordningen gällande kostnadsfördelning
Abstract Purpose: When the production of pipe transport occurs, the water supply system, television- and computer system (Opto), heating supplier and other pipe actors cooperates from the design phase to the production phase which entails a cost for each pipe actor. The current problem is the indus...
Main Authors: | , |
---|---|
Format: | Others |
Language: | Swedish |
Published: |
Tekniska Högskolan, Högskolan i Jönköping, JTH, Byggnadsteknik och belysningsvetenskap
2018
|
Subjects: | |
Online Access: | http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-41609 |