Småhustillverkarens projektering med BIM i jämförelse med 2D-teknik
Purpose: A fear of change has been in the Swedish construction industry. Errors and delays are seen as obstacles to development in the construction industry. Industrial construction means more automated manufacturing, which places higher demands on the design. The design stage is the bottleneck for...
Main Authors: | Rådberg, Adam, Aronsson, Albin |
---|---|
Format: | Others |
Language: | Swedish |
Published: |
Tekniska Högskolan, Högskolan i Jönköping, JTH, Byggnadsteknik
2017
|
Subjects: | |
Online Access: | http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-36538 |
Similar Items
-
Projektering av träprefabricerade byggelement : Jämförelse mellan 2D-CAD och BIM
by: Forss, Arvid
Published: (2018) -
BIM-projektering med fokus på tidplanering - 4D projektering med Vico Office från Peabs projekt Bottenhavet
by: Löfgren, Jakob
Published: (2015) -
PROJEKTERING MED TVÅDIMENSIONELLA ELLER TREDIMENSIONELLA RITNINGAR : En jämförelse baserad på konsulters erfarenhet
by: Ezzidin, Jin
Published: (2016) -
BIM i projekterings- och produktionsprocessen
by: Karlsson, Philip, et al.
Published: (2021) -
BIM jämfört med 2D-CAD vid projektering : En jämförelse mellan Tekla Structures och traditionell 2D-CAD vid projektering av grundkonstruktioner
by: Vengelin, Alexander, et al.
Published: (2018)