ANALYSIS FOR AN ECONOMICALLY SUITABLE COAL TO PUTTALAM COAL POWER STATION TO RUN THE PLANT IN FULL LOAD CAPACITY
Sri Lanka is an island at the Indian Ocean with 65234 km2 and it has a power demand of 2000 MW. The hydro power was the main power source before year 2000, after maximum usage of hydro power Sri Lanka installed fossil fuel power plant to achieve the demand. Then the electricity price gradually incre...
Main Author: | Weerathunga, Lahiru |
---|---|
Format: | Others |
Language: | English |
Published: |
Högskolan i Gävle, Avdelningen för bygg- energi- och miljöteknik
2014
|
Subjects: | |
Online Access: | http://urn.kb.se/resolve?urn=urn:nbn:se:hig:diva-16344 |
Similar Items
-
Coal Sector Returns and Oil Prices: Developed and Emerging Countries
by: Mohammad Z. Hasan, et al.
Published: (2015-06-01) -
Methods for price determination (justification) at economic-geological evaluation of coal deposits
by: H. I. Rudko, et al.
Published: (2018-12-01) -
Identification of Improved Stratigies for Processing Fine Coal
by: Ali, Zulfiqar
Published: (2017) -
Improved strategies for processing fine coal streams
by: Ali, Zulfiqar
Published: (2014) -
Improvement of Technology and Jar Mills for Preparation of Coal-Water Fuel from Waste Coal
by: V. I. Murko, et al.
Published: (2020-03-01)