Automatically measuring the losses of a transformer

This thesis is an ongoing project of Alstom Power Sweden AB, Växjö with a collaboration of Blekinge Institute of Technology [BTH] to automatically measure the losses of a transformer. So far the company performed the measurements manually to get this loss, and they decided to automatize the measurem...

Full description

Bibliographic Details
Main Author: Junaydin Mohamed, Murad
Format: Others
Language:English
Published: Blekinge Tekniska Högskola, Institutionen för signalbehandling 2016
Online Access:http://urn.kb.se/resolve?urn=urn:nbn:se:bth-12870
id ndltd-UPSALLA1-oai-DiVA.org-bth-12870
record_format oai_dc
spelling ndltd-UPSALLA1-oai-DiVA.org-bth-128702016-07-08T05:19:59ZAutomatically measuring the losses of a transformerengJunaydin Mohamed, MuradBlekinge Tekniska Högskola, Institutionen för signalbehandling2016This thesis is an ongoing project of Alstom Power Sweden AB, Växjö with a collaboration of Blekinge Institute of Technology [BTH] to automatically measure the losses of a transformer. So far the company performed the measurements manually to get this loss, and they decided to automatize the measurement process. This paper presents the state space modelling approach of DC-DC Buck converter and simulation of the whole measurement circuit incorporated with the PID controller. The PID controller will control the outputs voltage of the buck converter and the output current of the resonant circuit (secondary current of the transformer) with PI controller and those will be displayed in graph. The switching frequency of the dc-dc converter (buck) is set to 50 kHz. This system is implemented in MATLAB Simulink software.  Student thesisinfo:eu-repo/semantics/bachelorThesistexthttp://urn.kb.se/resolve?urn=urn:nbn:se:bth-12870application/pdfinfo:eu-repo/semantics/openAccess
collection NDLTD
language English
format Others
sources NDLTD
description This thesis is an ongoing project of Alstom Power Sweden AB, Växjö with a collaboration of Blekinge Institute of Technology [BTH] to automatically measure the losses of a transformer. So far the company performed the measurements manually to get this loss, and they decided to automatize the measurement process. This paper presents the state space modelling approach of DC-DC Buck converter and simulation of the whole measurement circuit incorporated with the PID controller. The PID controller will control the outputs voltage of the buck converter and the output current of the resonant circuit (secondary current of the transformer) with PI controller and those will be displayed in graph. The switching frequency of the dc-dc converter (buck) is set to 50 kHz. This system is implemented in MATLAB Simulink software. 
author Junaydin Mohamed, Murad
spellingShingle Junaydin Mohamed, Murad
Automatically measuring the losses of a transformer
author_facet Junaydin Mohamed, Murad
author_sort Junaydin Mohamed, Murad
title Automatically measuring the losses of a transformer
title_short Automatically measuring the losses of a transformer
title_full Automatically measuring the losses of a transformer
title_fullStr Automatically measuring the losses of a transformer
title_full_unstemmed Automatically measuring the losses of a transformer
title_sort automatically measuring the losses of a transformer
publisher Blekinge Tekniska Högskola, Institutionen för signalbehandling
publishDate 2016
url http://urn.kb.se/resolve?urn=urn:nbn:se:bth-12870
work_keys_str_mv AT junaydinmohamedmurad automaticallymeasuringthelossesofatransformer
_version_ 1718342023757430784