Mechanics-based model to predict ballast-related maintenance timing and costs
A mechanics-based model has been developed which predicts the timing of required ballast maintenance based on track settlement and roughness. With user-defined track material properties, loading characteristics, and maintenance technique to be applied, the model determines the rate of track roughnes...
Main Author: | Chrismer, Steven Mark |
---|---|
Language: | ENG |
Published: |
ScholarWorks@UMass Amherst
1994
|
Subjects: | |
Online Access: | https://scholarworks.umass.edu/dissertations/AAI9420610 |
Similar Items
-
Evaluation of ballast materials based on ballast particle characteristics and functions
by: Han, Xiangdong
Published: (1998) -
A METHODOLOGY TO PREDICT THE ELASTIC AND INELASTIC BEHAVIOR OF RAILROAD BALLAST
by: ALVA-HURTADO, JORGE ELIAS DOMINGO
Published: (1980) -
The weibull time-dependent growth model of marine corrosion in seawater ballast tank
by: Md. Noor, Norhazilan, et al.
Published: (2007) -
Enhancing Ballast Performance Using Geocell Confinement
by: Leshchinsky, Ben
Published: (2012) -
Time cost model for water related projects
by: Ahmad, Siti Farida
Published: (2020)