The long-term operation of overyear storage hydroelectric projects within a mixed hydrothermal generating system
It is necessary to establish a new operating policy when a major hydro electric project is introduced into an existing generating system. When the project has a large reservoir, capable of storing substantial volumes of water over a number of years, then the operating policy cannot be confined to th...
Main Author: | Caselton, William F. |
---|---|
Language: | English |
Published: |
University of British Columbia
2011
|
Online Access: | http://hdl.handle.net/2429/31828 |
Similar Items
-
Short-term optimal operation of a hydroelectric system
by: Kotuiga, Willy Walter
Published: (1980) -
Operational decision making for a multi-purpose reservoir with total seasonal inflow forecast
by: Caselton, William F.
Published: (2011) -
Hydroelectric power generator
Published: () -
Short-term optimal operation of a hydroelectric power system
by: Amir, B. H.
Published: (1983) -
Electromagnetic Analysis of Hydroelectric Generators
by: Ranlöf, Martin
Published: (2011)