An automated corrective action selective assistant

Automated daily site reporting as an integral part of a project management system has the potential to be the missing link for effective construction project monitoring and control. Problem trends over time can be detected more readily through the maintenance of daily site records that track pro...

Full description

Bibliographic Details
Main Author: Fayek, Aminah
Format: Others
Language:English
Published: 2008
Online Access:http://hdl.handle.net/2429/2909
id ndltd-UBC-oai-circle.library.ubc.ca-2429-2909
record_format oai_dc
spelling ndltd-UBC-oai-circle.library.ubc.ca-2429-29092018-01-05T17:31:08Z An automated corrective action selective assistant Fayek, Aminah Automated daily site reporting as an integral part of a project management system has the potential to be the missing link for effective construction project monitoring and control. Problem trends over time can be detected more readily through the maintenance of daily site records that track problems occurring against activities; timely corrective action can thus be initiated more quickly. The goal of this thesis is to develop a schema to perform the automated interpretation of daily site records to identify activities that are experiencing difficulties; to identify the source(s) of these problems; to identify the types of problems resulting; to find collaborating information from the daily site records to validate the causes of these problems; and to suggest likely corrective actions. A framework is presented wherein each component of the analysis schema is defined. Fuzzy logic is used to define the imprecise relationships that exist between these components. A prototype system is developed to implement and test the schema. The components of the prototype are: a user interface; data files; an application program; an inference engine; and an expert rule base. The prototype is validated by way of several simple examples solved both manually and by the computer. A case study of a hypothetical construction project is also treated by automated interpretation to demonstrate the workability of the prototype on a multi-activity project. The model developed in this thesis would benefit from addition to and refinement of the expert rule base, and further investigation of the use of fuzzy logic to incorporate in the analysis other items of information that can be collected on site. A future system would make use of user feedback, reporting on which corrective actions have been implemented and their impacts on performance. Applied Science, Faculty of Civil Engineering, Department of Graduate 2008-12-15T22:52:11Z 2008-12-15T22:52:11Z 1992 1992-11 Text Thesis/Dissertation http://hdl.handle.net/2429/2909 eng For non-commercial purposes only, such as research, private study and education. Additional conditions apply, see Terms of Use https://open.library.ubc.ca/terms_of_use. 7103556 bytes application/pdf
collection NDLTD
language English
format Others
sources NDLTD
description Automated daily site reporting as an integral part of a project management system has the potential to be the missing link for effective construction project monitoring and control. Problem trends over time can be detected more readily through the maintenance of daily site records that track problems occurring against activities; timely corrective action can thus be initiated more quickly. The goal of this thesis is to develop a schema to perform the automated interpretation of daily site records to identify activities that are experiencing difficulties; to identify the source(s) of these problems; to identify the types of problems resulting; to find collaborating information from the daily site records to validate the causes of these problems; and to suggest likely corrective actions. A framework is presented wherein each component of the analysis schema is defined. Fuzzy logic is used to define the imprecise relationships that exist between these components. A prototype system is developed to implement and test the schema. The components of the prototype are: a user interface; data files; an application program; an inference engine; and an expert rule base. The prototype is validated by way of several simple examples solved both manually and by the computer. A case study of a hypothetical construction project is also treated by automated interpretation to demonstrate the workability of the prototype on a multi-activity project. The model developed in this thesis would benefit from addition to and refinement of the expert rule base, and further investigation of the use of fuzzy logic to incorporate in the analysis other items of information that can be collected on site. A future system would make use of user feedback, reporting on which corrective actions have been implemented and their impacts on performance. === Applied Science, Faculty of === Civil Engineering, Department of === Graduate
author Fayek, Aminah
spellingShingle Fayek, Aminah
An automated corrective action selective assistant
author_facet Fayek, Aminah
author_sort Fayek, Aminah
title An automated corrective action selective assistant
title_short An automated corrective action selective assistant
title_full An automated corrective action selective assistant
title_fullStr An automated corrective action selective assistant
title_full_unstemmed An automated corrective action selective assistant
title_sort automated corrective action selective assistant
publishDate 2008
url http://hdl.handle.net/2429/2909
work_keys_str_mv AT fayekaminah anautomatedcorrectiveactionselectiveassistant
AT fayekaminah automatedcorrectiveactionselectiveassistant
_version_ 1718586315269734400