Optimum life of production assets in short and medium term timber harvesting projects

An optimal equipment replacement model was developed, that is useful for evaluating machinery replacement proposals. The model is based on discounted cash flow methods, and performs the evaluation by comparing the cash flow profile of the currently owned machine (the "defender") against th...

Full description

Bibliographic Details
Main Author: Oyugi Ogweno, Donald C.
Language:English
Published: University of British Columbia 2010
Online Access:http://hdl.handle.net/2429/28295

Similar Items