Optimum life of production assets in short and medium term timber harvesting projects

An optimal equipment replacement model was developed, that is useful for evaluating machinery replacement proposals. The model is based on discounted cash flow methods, and performs the evaluation by comparing the cash flow profile of the currently owned machine (the "defender") against th...

Full description

Bibliographic Details
Main Author: Oyugi Ogweno, Donald C.
Language:English
Published: University of British Columbia 2010
Online Access:http://hdl.handle.net/2429/28295
id ndltd-UBC-oai-circle.library.ubc.ca-2429-28295
record_format oai_dc
spelling ndltd-UBC-oai-circle.library.ubc.ca-2429-282952018-01-05T17:44:36Z Optimum life of production assets in short and medium term timber harvesting projects Oyugi Ogweno, Donald C. An optimal equipment replacement model was developed, that is useful for evaluating machinery replacement proposals. The model is based on discounted cash flow methods, and performs the evaluation by comparing the cash flow profile of the currently owned machine (the "defender") against that of a proposed replacement (the "challenger") over a finite time period. The optimum time to replace the defender is determined as the age which will maximize the net revenues from operating both machines over the planning horizon. Real time data were collected from the operation of similar machines, and used to estimate repair and maintenance costs, machine resale values, and machine operating costs. These costs were then discounted to a base year, and aggregated into cash flow profiles. The cash flow profiles were then converted to annual equivalents, which form the basis of the replacement decision. A method of estimating the rate at which a group of machines accumulate technological obsolescence was developed. These estimates are made as a function of the improved ratio of productivity to fuel consumption of new generations of machines over older ones. The replacement model was encoded into a microcomputer spreadsheet application program, that is useful as a financial planning tool in short and medium term timber harvesting projects. The program is interactive, and can be used to evaluate the sensitivity of the proposed replacement to different economic parameters. Sensitivity analyses was performed on the computer model by varying six of the input variables. From the results, it was concluded that the optimum life was relatively insensitivity to changes in most of the inputs. The cash flows, however, was highly sensitive to changes in most of the input variables. Changes in the length of the planning horizon had the highest effect on both optimum life and cash flows of the assets. The value added cost of the product had no effect on optimum life, but a very high effect on cash flows. Forestry, Faculty of Graduate 2010-09-09T16:42:14Z 2010-09-09T16:42:14Z 1988 Text Thesis/Dissertation http://hdl.handle.net/2429/28295 eng For non-commercial purposes only, such as research, private study and education. Additional conditions apply, see Terms of Use https://open.library.ubc.ca/terms_of_use. University of British Columbia
collection NDLTD
language English
sources NDLTD
description An optimal equipment replacement model was developed, that is useful for evaluating machinery replacement proposals. The model is based on discounted cash flow methods, and performs the evaluation by comparing the cash flow profile of the currently owned machine (the "defender") against that of a proposed replacement (the "challenger") over a finite time period. The optimum time to replace the defender is determined as the age which will maximize the net revenues from operating both machines over the planning horizon. Real time data were collected from the operation of similar machines, and used to estimate repair and maintenance costs, machine resale values, and machine operating costs. These costs were then discounted to a base year, and aggregated into cash flow profiles. The cash flow profiles were then converted to annual equivalents, which form the basis of the replacement decision. A method of estimating the rate at which a group of machines accumulate technological obsolescence was developed. These estimates are made as a function of the improved ratio of productivity to fuel consumption of new generations of machines over older ones. The replacement model was encoded into a microcomputer spreadsheet application program, that is useful as a financial planning tool in short and medium term timber harvesting projects. The program is interactive, and can be used to evaluate the sensitivity of the proposed replacement to different economic parameters. Sensitivity analyses was performed on the computer model by varying six of the input variables. From the results, it was concluded that the optimum life was relatively insensitivity to changes in most of the inputs. The cash flows, however, was highly sensitive to changes in most of the input variables. Changes in the length of the planning horizon had the highest effect on both optimum life and cash flows of the assets. The value added cost of the product had no effect on optimum life, but a very high effect on cash flows. === Forestry, Faculty of === Graduate
author Oyugi Ogweno, Donald C.
spellingShingle Oyugi Ogweno, Donald C.
Optimum life of production assets in short and medium term timber harvesting projects
author_facet Oyugi Ogweno, Donald C.
author_sort Oyugi Ogweno, Donald C.
title Optimum life of production assets in short and medium term timber harvesting projects
title_short Optimum life of production assets in short and medium term timber harvesting projects
title_full Optimum life of production assets in short and medium term timber harvesting projects
title_fullStr Optimum life of production assets in short and medium term timber harvesting projects
title_full_unstemmed Optimum life of production assets in short and medium term timber harvesting projects
title_sort optimum life of production assets in short and medium term timber harvesting projects
publisher University of British Columbia
publishDate 2010
url http://hdl.handle.net/2429/28295
work_keys_str_mv AT oyugiogwenodonaldc optimumlifeofproductionassetsinshortandmediumtermtimberharvestingprojects
_version_ 1718593593886638080