Feasibility of a shortened pathway for nitrogen removal from highly nitrogenous wastes
The objective of the research program was to demonstrate the feasibility of removing nitrogen from highly nitrogenous wastes by a shortened nitrification/denitrification pathway. This process bypasses the nitrite oxidation step to nitrate and the concomitant nitrate reduction to nitrite. The success...
Main Author: | Turk, Oussama |
---|---|
Language: | English |
Published: |
University of British Columbia
2010
|
Online Access: | http://hdl.handle.net/2429/27210 |
Similar Items
-
Nitrogen removal mechanisms and pathways in facultative waste stabilization ponds in the United Kingdom
by: Van der Linde, Eleanor Relton Claire
Published: (2009) -
Nitrogen removal from the waste aluminum dross in alkaline solution
by: Meng-Ju Jhong, et al.
Published: (2014) -
Nitrogen and phosphorous removal from groundwater using waste materials
by: Gkiouzepas, Stylianos
Published: (2016) -
The feasibility of nitrogen and phosphorus removal in aquaculture wastewater by microalgae
by: Pei-Ju Wu, et al.
Published: (2013) -
BIOLOGICAL NITROGEN REMOVAL AT HIGH PERFORMANCES IN PLATFORM FOR THE TREATMENT OF INDUSTRIAL LIQUID WASTES
by: A.L. Eusebi, et al.
Published: (2009-05-01)