Operating risk : planning for flexible mining systems

This research contributes to understanding the interaction between ground-related problems and mining systems as a basis for the development of flexible mining systems. It has demonstrated that ground-related problems impose a significant operating risk factor that requires particular attention in p...

Full description

Bibliographic Details
Main Author: Kazakidis, Vassilios
Format: Others
Language:English
Published: 2009
Online Access:http://hdl.handle.net/2429/13125
id ndltd-UBC-oai-circle.library.ubc.ca-2429-13125
record_format oai_dc
spelling ndltd-UBC-oai-circle.library.ubc.ca-2429-131252018-01-05T17:36:38Z Operating risk : planning for flexible mining systems Kazakidis, Vassilios This research contributes to understanding the interaction between ground-related problems and mining systems as a basis for the development of flexible mining systems. It has demonstrated that ground-related problems impose a significant operating risk factor that requires particular attention in proactive mine planning and design. A new philosophy for quantifying the impact of ground-related problems and assessing the links between mine planning and geomechanics was established. The various types of potential problems were classified based on review of case studies and the surveillance of ground failures in several underground hard rock mines of the Sudbury Basin. It was demonstrated that, despite serious efforts in the design of underground mines, ground-related problems still cannot be totally avoided. A time-dependent internal risk model was established to quantify the impact of ground-related problems in mine production systems. Subjective probabilities provide the input for a reliability analysis, which derives the required input parameters for production simulation. Reliability analyses that are currently used to calculate the reliability of mine equipment were applied for the case of mine subsystems with ground-related problems. A cost impact model that is dependent on the parameters determined in a reliability analysis was introduced. Flexibility needs in mine planning and design, with respect to ground-related problems, were analyzed through conventional discounted cash flow analysis, real options analysis, production simulation, and Monte-Carlo simulation. Approaches that are currently applied in investment science and decision making were evaluated in terms of their applicability to evaluate such flexibility needs in mining systems. A methodology that includes the applicability of project valuation analyses to assess flexible mining systems with respect to potential ground-related problems, along with a flexibility index, were introduced. Their applicability is demonstrated through test case studies. Contingency planning and flexibility assessment by such means can be integrated into future mine production systems to account for the potential risk of ground-related problems for more proactive mine planning and design. Applied Science, Faculty of Mining Engineering, Keevil Institute of Graduate 2009-09-23T20:13:23Z 2009-09-23T20:13:23Z 2001 2001-05 Text Thesis/Dissertation http://hdl.handle.net/2429/13125 eng For non-commercial purposes only, such as research, private study and education. Additional conditions apply, see Terms of Use https://open.library.ubc.ca/terms_of_use. 15904075 bytes application/pdf
collection NDLTD
language English
format Others
sources NDLTD
description This research contributes to understanding the interaction between ground-related problems and mining systems as a basis for the development of flexible mining systems. It has demonstrated that ground-related problems impose a significant operating risk factor that requires particular attention in proactive mine planning and design. A new philosophy for quantifying the impact of ground-related problems and assessing the links between mine planning and geomechanics was established. The various types of potential problems were classified based on review of case studies and the surveillance of ground failures in several underground hard rock mines of the Sudbury Basin. It was demonstrated that, despite serious efforts in the design of underground mines, ground-related problems still cannot be totally avoided. A time-dependent internal risk model was established to quantify the impact of ground-related problems in mine production systems. Subjective probabilities provide the input for a reliability analysis, which derives the required input parameters for production simulation. Reliability analyses that are currently used to calculate the reliability of mine equipment were applied for the case of mine subsystems with ground-related problems. A cost impact model that is dependent on the parameters determined in a reliability analysis was introduced. Flexibility needs in mine planning and design, with respect to ground-related problems, were analyzed through conventional discounted cash flow analysis, real options analysis, production simulation, and Monte-Carlo simulation. Approaches that are currently applied in investment science and decision making were evaluated in terms of their applicability to evaluate such flexibility needs in mining systems. A methodology that includes the applicability of project valuation analyses to assess flexible mining systems with respect to potential ground-related problems, along with a flexibility index, were introduced. Their applicability is demonstrated through test case studies. Contingency planning and flexibility assessment by such means can be integrated into future mine production systems to account for the potential risk of ground-related problems for more proactive mine planning and design. === Applied Science, Faculty of === Mining Engineering, Keevil Institute of === Graduate
author Kazakidis, Vassilios
spellingShingle Kazakidis, Vassilios
Operating risk : planning for flexible mining systems
author_facet Kazakidis, Vassilios
author_sort Kazakidis, Vassilios
title Operating risk : planning for flexible mining systems
title_short Operating risk : planning for flexible mining systems
title_full Operating risk : planning for flexible mining systems
title_fullStr Operating risk : planning for flexible mining systems
title_full_unstemmed Operating risk : planning for flexible mining systems
title_sort operating risk : planning for flexible mining systems
publishDate 2009
url http://hdl.handle.net/2429/13125
work_keys_str_mv AT kazakidisvassilios operatingriskplanningforflexibleminingsystems
_version_ 1718589278364106752