Using Value Stream Map to Improve Overall Equipment Effectiveness
碩士 === 元智大學 === 工業工程與管理學系 === 107 === This paper mainly uses the VSM scheme as the basis for integrating the product process activities, and the OEE efficiency statistics for the process assembly line of the case company is the basis of the research case. The operating plan collects the case process...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2019
|
Online Access: | http://ndltd.ncl.edu.tw/handle/tz36u5 |
id |
ndltd-TW-107YZU05031055 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-107YZU050310552019-11-08T05:12:15Z http://ndltd.ncl.edu.tw/handle/tz36u5 Using Value Stream Map to Improve Overall Equipment Effectiveness 運用價值流程圖改善製程設備整體效率 Chi-Yuan Chang 張寄遠 碩士 元智大學 工業工程與管理學系 107 This paper mainly uses the VSM scheme as the basis for integrating the product process activities, and the OEE efficiency statistics for the process assembly line of the case company is the basis of the research case. The operating plan collects the case process information and preliminarily plots the current status of the production line based on the VSM principle, in order to facilitate the review and use of OEE for sub-item statistics, to calculate the overall efficiency of the equipment as the basis for improvement; according to the Plato analysis method for the main bad The effi-ciency loss caused by the factors, and the related events of equipment non-availability efficiency are classified into the relationship between the working time and the waiting time, and then the problem is determined through PDCA, and the improvement method is determined accordingly, and the efficiency of the equipment is improved to improve the overall OEE efficiency. Improvement. Improvements in the original OEE performance through equipment have im-proved performance by more than 10%, while VSM observed the overall improve-ment of the whole plant, the production lead time was shortened from 143 minutes to 115 minutes, the improvement rate was 19.580%; The cycle time 48.94 seconds was shortened to 46.42 seconds, and the improvement was 5.150%. The WIP was re-duced from 993 pcs to 515 pcs, with an improvement of 48.137%. Keyword: OEE, VSM, PDCA, Pareto Yun-Kung Chung 鍾雲恭 2019 學位論文 ; thesis 64 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 元智大學 === 工業工程與管理學系 === 107 === This paper mainly uses the VSM scheme as the basis for integrating the product process activities, and the OEE efficiency statistics for the process assembly line of the case company is the basis of the research case. The operating plan collects the case process information and preliminarily plots the current status of the production line based on the VSM principle, in order to facilitate the review and use of OEE for sub-item statistics, to calculate the overall efficiency of the equipment as the basis for improvement; according to the Plato analysis method for the main bad The effi-ciency loss caused by the factors, and the related events of equipment non-availability efficiency are classified into the relationship between the working time and the waiting time, and then the problem is determined through PDCA, and the improvement method is determined accordingly, and the efficiency of the equipment is improved to improve the overall OEE efficiency. Improvement.
Improvements in the original OEE performance through equipment have im-proved performance by more than 10%, while VSM observed the overall improve-ment of the whole plant, the production lead time was shortened from 143 minutes to 115 minutes, the improvement rate was 19.580%; The cycle time 48.94 seconds was shortened to 46.42 seconds, and the improvement was 5.150%. The WIP was re-duced from 993 pcs to 515 pcs, with an improvement of 48.137%.
Keyword: OEE, VSM, PDCA, Pareto
|
author2 |
Yun-Kung Chung |
author_facet |
Yun-Kung Chung Chi-Yuan Chang 張寄遠 |
author |
Chi-Yuan Chang 張寄遠 |
spellingShingle |
Chi-Yuan Chang 張寄遠 Using Value Stream Map to Improve Overall Equipment Effectiveness |
author_sort |
Chi-Yuan Chang |
title |
Using Value Stream Map to Improve Overall Equipment Effectiveness |
title_short |
Using Value Stream Map to Improve Overall Equipment Effectiveness |
title_full |
Using Value Stream Map to Improve Overall Equipment Effectiveness |
title_fullStr |
Using Value Stream Map to Improve Overall Equipment Effectiveness |
title_full_unstemmed |
Using Value Stream Map to Improve Overall Equipment Effectiveness |
title_sort |
using value stream map to improve overall equipment effectiveness |
publishDate |
2019 |
url |
http://ndltd.ncl.edu.tw/handle/tz36u5 |
work_keys_str_mv |
AT chiyuanchang usingvaluestreammaptoimproveoverallequipmenteffectiveness AT zhāngjìyuǎn usingvaluestreammaptoimproveoverallequipmenteffectiveness AT chiyuanchang yùnyòngjiàzhíliúchéngtúgǎishànzhìchéngshèbèizhěngtǐxiàolǜ AT zhāngjìyuǎn yùnyòngjiàzhíliúchéngtúgǎishànzhìchéngshèbèizhěngtǐxiàolǜ |
_version_ |
1719288396482871296 |