Using Value Stream Map to Improve Overall Equipment Effectiveness

碩士 === 元智大學 === 工業工程與管理學系 === 107 === This paper mainly uses the VSM scheme as the basis for integrating the product process activities, and the OEE efficiency statistics for the process assembly line of the case company is the basis of the research case. The operating plan collects the case process...

Full description

Bibliographic Details
Main Authors: Chi-Yuan Chang, 張寄遠
Other Authors: Yun-Kung Chung
Format: Others
Language:zh-TW
Published: 2019
Online Access:http://ndltd.ncl.edu.tw/handle/tz36u5
id ndltd-TW-107YZU05031055
record_format oai_dc
spelling ndltd-TW-107YZU050310552019-11-08T05:12:15Z http://ndltd.ncl.edu.tw/handle/tz36u5 Using Value Stream Map to Improve Overall Equipment Effectiveness 運用價值流程圖改善製程設備整體效率 Chi-Yuan Chang 張寄遠 碩士 元智大學 工業工程與管理學系 107 This paper mainly uses the VSM scheme as the basis for integrating the product process activities, and the OEE efficiency statistics for the process assembly line of the case company is the basis of the research case. The operating plan collects the case process information and preliminarily plots the current status of the production line based on the VSM principle, in order to facilitate the review and use of OEE for sub-item statistics, to calculate the overall efficiency of the equipment as the basis for improvement; according to the Plato analysis method for the main bad The effi-ciency loss caused by the factors, and the related events of equipment non-availability efficiency are classified into the relationship between the working time and the waiting time, and then the problem is determined through PDCA, and the improvement method is determined accordingly, and the efficiency of the equipment is improved to improve the overall OEE efficiency. Improvement. Improvements in the original OEE performance through equipment have im-proved performance by more than 10%, while VSM observed the overall improve-ment of the whole plant, the production lead time was shortened from 143 minutes to 115 minutes, the improvement rate was 19.580%; The cycle time 48.94 seconds was shortened to 46.42 seconds, and the improvement was 5.150%. The WIP was re-duced from 993 pcs to 515 pcs, with an improvement of 48.137%. Keyword: OEE, VSM, PDCA, Pareto Yun-Kung Chung 鍾雲恭 2019 學位論文 ; thesis 64 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 元智大學 === 工業工程與管理學系 === 107 === This paper mainly uses the VSM scheme as the basis for integrating the product process activities, and the OEE efficiency statistics for the process assembly line of the case company is the basis of the research case. The operating plan collects the case process information and preliminarily plots the current status of the production line based on the VSM principle, in order to facilitate the review and use of OEE for sub-item statistics, to calculate the overall efficiency of the equipment as the basis for improvement; according to the Plato analysis method for the main bad The effi-ciency loss caused by the factors, and the related events of equipment non-availability efficiency are classified into the relationship between the working time and the waiting time, and then the problem is determined through PDCA, and the improvement method is determined accordingly, and the efficiency of the equipment is improved to improve the overall OEE efficiency. Improvement. Improvements in the original OEE performance through equipment have im-proved performance by more than 10%, while VSM observed the overall improve-ment of the whole plant, the production lead time was shortened from 143 minutes to 115 minutes, the improvement rate was 19.580%; The cycle time 48.94 seconds was shortened to 46.42 seconds, and the improvement was 5.150%. The WIP was re-duced from 993 pcs to 515 pcs, with an improvement of 48.137%. Keyword: OEE, VSM, PDCA, Pareto
author2 Yun-Kung Chung
author_facet Yun-Kung Chung
Chi-Yuan Chang
張寄遠
author Chi-Yuan Chang
張寄遠
spellingShingle Chi-Yuan Chang
張寄遠
Using Value Stream Map to Improve Overall Equipment Effectiveness
author_sort Chi-Yuan Chang
title Using Value Stream Map to Improve Overall Equipment Effectiveness
title_short Using Value Stream Map to Improve Overall Equipment Effectiveness
title_full Using Value Stream Map to Improve Overall Equipment Effectiveness
title_fullStr Using Value Stream Map to Improve Overall Equipment Effectiveness
title_full_unstemmed Using Value Stream Map to Improve Overall Equipment Effectiveness
title_sort using value stream map to improve overall equipment effectiveness
publishDate 2019
url http://ndltd.ncl.edu.tw/handle/tz36u5
work_keys_str_mv AT chiyuanchang usingvaluestreammaptoimproveoverallequipmenteffectiveness
AT zhāngjìyuǎn usingvaluestreammaptoimproveoverallequipmenteffectiveness
AT chiyuanchang yùnyòngjiàzhíliúchéngtúgǎishànzhìchéngshèbèizhěngtǐxiàolǜ
AT zhāngjìyuǎn yùnyòngjiàzhíliúchéngtúgǎishànzhìchéngshèbèizhěngtǐxiàolǜ
_version_ 1719288396482871296