Conflict and Integration of Construction Parallel Subcontract Interfaces: A Case Study of the Taichung Metropolitan Elevated Railway System

碩士 === 國立雲林科技大學 === 營建工程系 === 107 === As the scale of planned construction projects has become larger and larger, the number of subcontracts in a single project has become more and more numerous. The complex of interfaces has led to conflicts between sub-contractors and even performance disputes....

Full description

Bibliographic Details
Main Authors: Shuei Shun Chen, 陳水順
Other Authors: Wei Tong Chen
Format: Others
Language:zh-TW
Published: 2019
Online Access:http://ndltd.ncl.edu.tw/handle/76sexs
id ndltd-TW-107YUNT0582022
record_format oai_dc
spelling ndltd-TW-107YUNT05820222019-10-18T05:21:44Z http://ndltd.ncl.edu.tw/handle/76sexs Conflict and Integration of Construction Parallel Subcontract Interfaces: A Case Study of the Taichung Metropolitan Elevated Railway System 平行標工程之介面衝突與整合—以台中都會區鐵路高架化計畫為例 Shuei Shun Chen 陳水順 碩士 國立雲林科技大學 營建工程系 107 As the scale of planned construction projects has become larger and larger, the number of subcontracts in a single project has become more and more numerous. The complex of interfaces has led to conflicts between sub-contractors and even performance disputes. So that projects can be completed on time and to a high standard of quality, it is crucial to deal with root problems: how to optimize subcontracting methods and coordinate interfaces between parallel subcontractors. This study summarizes the historical literature and the implementation experience of the bureaus-in-charge which carried out large scale construction projects. This research proposes eight common factors of sub-contracting: professional ability, vendor capability, duration reduction, interface reduction, effective use of resources, purchasing organization size, segmentation usage requirements, and environmental impacts. This research also proposes other methods of sub-contracting to the bureaus-in-charge of planned construction projects. Parallel subcontract can be divided to five interfaces. They are: time, space, construction, contract, environment. Nine mechanisms for integration between subcontractors can be implemented during the first three phases of project development. During the planning and design stage, the mechanisms are drawings integration, design coordination meeting, and design review meeting. During the project tendering stage: interface control document and milestone setting. During the project execution stage: interface control document, regular interface coordination meeting, overall project network diagram, occupational safety and health agreement organization. Finally, the Taichung Metropolitan Elevated Railway System is provided as a case study. It is used to discuss, verify, and improve processes for sub-contracting and interface integration. It is hoped that this research will be helpful to the authorities in charge of interface integration and subcontractor management in future large-scale construction projects. Wei Tong Chen 陳維東 2019 學位論文 ; thesis 92 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立雲林科技大學 === 營建工程系 === 107 === As the scale of planned construction projects has become larger and larger, the number of subcontracts in a single project has become more and more numerous. The complex of interfaces has led to conflicts between sub-contractors and even performance disputes. So that projects can be completed on time and to a high standard of quality, it is crucial to deal with root problems: how to optimize subcontracting methods and coordinate interfaces between parallel subcontractors. This study summarizes the historical literature and the implementation experience of the bureaus-in-charge which carried out large scale construction projects. This research proposes eight common factors of sub-contracting: professional ability, vendor capability, duration reduction, interface reduction, effective use of resources, purchasing organization size, segmentation usage requirements, and environmental impacts. This research also proposes other methods of sub-contracting to the bureaus-in-charge of planned construction projects. Parallel subcontract can be divided to five interfaces. They are: time, space, construction, contract, environment. Nine mechanisms for integration between subcontractors can be implemented during the first three phases of project development. During the planning and design stage, the mechanisms are drawings integration, design coordination meeting, and design review meeting. During the project tendering stage: interface control document and milestone setting. During the project execution stage: interface control document, regular interface coordination meeting, overall project network diagram, occupational safety and health agreement organization. Finally, the Taichung Metropolitan Elevated Railway System is provided as a case study. It is used to discuss, verify, and improve processes for sub-contracting and interface integration. It is hoped that this research will be helpful to the authorities in charge of interface integration and subcontractor management in future large-scale construction projects.
author2 Wei Tong Chen
author_facet Wei Tong Chen
Shuei Shun Chen
陳水順
author Shuei Shun Chen
陳水順
spellingShingle Shuei Shun Chen
陳水順
Conflict and Integration of Construction Parallel Subcontract Interfaces: A Case Study of the Taichung Metropolitan Elevated Railway System
author_sort Shuei Shun Chen
title Conflict and Integration of Construction Parallel Subcontract Interfaces: A Case Study of the Taichung Metropolitan Elevated Railway System
title_short Conflict and Integration of Construction Parallel Subcontract Interfaces: A Case Study of the Taichung Metropolitan Elevated Railway System
title_full Conflict and Integration of Construction Parallel Subcontract Interfaces: A Case Study of the Taichung Metropolitan Elevated Railway System
title_fullStr Conflict and Integration of Construction Parallel Subcontract Interfaces: A Case Study of the Taichung Metropolitan Elevated Railway System
title_full_unstemmed Conflict and Integration of Construction Parallel Subcontract Interfaces: A Case Study of the Taichung Metropolitan Elevated Railway System
title_sort conflict and integration of construction parallel subcontract interfaces: a case study of the taichung metropolitan elevated railway system
publishDate 2019
url http://ndltd.ncl.edu.tw/handle/76sexs
work_keys_str_mv AT shueishunchen conflictandintegrationofconstructionparallelsubcontractinterfacesacasestudyofthetaichungmetropolitanelevatedrailwaysystem
AT chénshuǐshùn conflictandintegrationofconstructionparallelsubcontractinterfacesacasestudyofthetaichungmetropolitanelevatedrailwaysystem
AT shueishunchen píngxíngbiāogōngchéngzhījièmiànchōngtūyǔzhěnghéyǐtáizhōngdōuhuìqūtiělùgāojiàhuàjìhuàwèilì
AT chénshuǐshùn píngxíngbiāogōngchéngzhījièmiànchōngtūyǔzhěnghéyǐtáizhōngdōuhuìqūtiělùgāojiàhuàjìhuàwèilì
_version_ 1719270459084636160