Conflict and Integration of Construction Parallel Subcontract Interfaces: A Case Study of the Taichung Metropolitan Elevated Railway System
碩士 === 國立雲林科技大學 === 營建工程系 === 107 === As the scale of planned construction projects has become larger and larger, the number of subcontracts in a single project has become more and more numerous. The complex of interfaces has led to conflicts between sub-contractors and even performance disputes....
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2019
|
Online Access: | http://ndltd.ncl.edu.tw/handle/76sexs |