Summary: | 碩士 === 國立臺北科技大學 === 環境工程與管理研究所 === 107 === Industrial development, the manufacture of a lot of waste, but the lack of proper disposal mechanism, and the arbitrary disposal of many illegal dumping sites, because the site cleaning and remediation planning through the waste investigation, intermediate processing and final disposal procedures, the process is cumbersome and time-consuming The cost is staggering, so this study expects to reduce the error in the estimation of waste quantity through stereo measurement, and understand the effectiveness of X-ray fluorescence spectroscopic analysis (XRF), in order to achieve rapid screening and save time and cost. The goal.
In this study, the "A site" was used as the research scope, and the test pit excavation, drilling, testing, and measurement nesting were planned. The Surfer software was used to calculate the waste quantity by grid calculation. The waste was screened for XRF characteristics to understand the difference between the judgments of the commercial waste toxicity characteristic dissolution procedure (TCLP) analysis.
In order to plan the removal of project funds, it can be more accurate and meet the current conditions of the site to achieve economic, audit management, tracking flow and avoid secondary pollution. It is hoped that the results of this research can provide relevant government units, design planning consultants and manufacturers to implement construction as a reference for future regulations, policies, processing techniques and management audits.
|