Research on Application of BIM in Steel Structure Hoisting Schedule Information System
碩士 === 國立臺灣科技大學 === 營建工程系 === 107 === During the construction planning stage of steel structures, the hoisting scheduling schedules when each steel component will be delivered to the construction site and when these on-site steel components will be hoisted and installed. Most of the planning is done...
Main Authors: | Yan-Min Chen, 陳彥民 |
---|---|
Other Authors: | Yo-Ming Hsieh |
Format: | Others |
Language: | zh-TW |
Published: |
2019
|
Online Access: | http://ndltd.ncl.edu.tw/handle/7456af |
Similar Items
-
hoist scheduling problem-HSP
by: Yu-kuo Chien, et al.
Published: (2003) -
Cyclic Hoist Scheduling Problems in Classical and Sustainabl
by: Lei, Weidong
Published: (2014) -
Hoist scheduling for an anodizing plant at an extrusion company
by: Alaa Jameel Alsaffar, et al.
Published: (2020-01-01) -
Optimal control on rock winder hoist scheduling
by: Badenhorst, Werner
Published: (2013) -
Modélisation et optimisation des Hoist Scheduling Problems
by: Feng, Jianguang
Published: (2017)