Summary: | 碩士 === 國立臺灣大學 === 土木工程學研究所 === 107 === The success or failure of the landscape project depends on the survival - status of the plant in the planting, and the survival of the plant is not only the health conditions of the plant itself, but also the materials and methods used in the planting are responsible for some success or failure; the landscape materials are wide variety in the market and the planting methods are different depending on the experience of each users. Therefore, how to use the new methods and new materials to reduce the risk of plant survival and continue the plant life cycle is the focus of this research.
This study reviews the relevant life cycle literature, understanding the definition and the life cycle''s importance, analysis of the impact of plant life cycle on landscape projects and landscape tree related maintenance management after planting discuss and analyze the materials and methods used in landscape planting construction, introduce the concept of life cycle and a provide reference for planning and design when implementing landscape projects.
This study focuses on the arbor planting method. Before the arbor planting, we will first check the relevant planting methods and conditions, including the type and nature of the work method, including soil dressing, arbor bracket, drainage, etc. The expert interviews of the first-line workers in the landscape plan to screen out the relevant factors that affects the growth of arbor planting and exclude the discussion of the planting in the construction method and materials are soil, bracket and three essential points of drainage。
The type of arbor has been decided at the beginning of the project planning design. In the past, due to the technical and construction factors or financial problems, the performance of the planting project wasn''t satisfactory. With the changes of the times, regardless of the public and private sector. It has been improved. Nowadays, the planting and planting related methods have also made great process. The designers have standardized on the planting and planting content in planning and design stage, and the construction unit has followed the construction during the contract. The acceptance and maintenance management stage directly affect the success of a case and involves the plant life cycle. All such subjects need to participate in the relevant projects through the owners, design units, construction companies and future custody units, and work together to make a landscape project not only succeed in the beginning but also in the future。
|