A Study for Technical Operation and Management of Marine Dredger

碩士 === 國立臺灣海洋大學 === 商船學系 === 107 === The drawing of marine transportation brings up the development of shipping industry .According to the statistics from tech News published in December 2017, about 90%of the international trade is via shipping. Hence strengthening the constructions and scale has be...

Full description

Bibliographic Details
Main Authors: Tzang,Chi-Tay, 臧啟泰
Other Authors: Tien, Wen-Kwo
Format: Others
Language:zh-TW
Published: 2019
Online Access:http://ndltd.ncl.edu.tw/handle/yp4sdx
id ndltd-TW-107NTOU5728002
record_format oai_dc
spelling ndltd-TW-107NTOU57280022019-05-16T01:40:51Z http://ndltd.ncl.edu.tw/handle/yp4sdx A Study for Technical Operation and Management of Marine Dredger 挖泥船操作技術及管理之研究 Tzang,Chi-Tay 臧啟泰 碩士 國立臺灣海洋大學 商船學系 107 The drawing of marine transportation brings up the development of shipping industry .According to the statistics from tech News published in December 2017, about 90%of the international trade is via shipping. Hence strengthening the constructions and scale has become an important. Particularly, the port has played an important role in transportation .With the demands of the huge size vessel in the global shipping markets; a large number of ports to accommodate to construct the large-scale port, Project of the large area is needed. However due to the outdated and small size dredger in Taiwan the majority of maritime projects rely mainly on the participation of dredgers from foreign countries. The construction environment is complex and full of variety in Taiwan. Taking newly built port for example digging of harbor basin fairway caisson foundation, the engineering geologic condition makes all the difference between success and failure. The duration of construction is greatly affected by efficiency of dredger which have varies of types. This study introduced dredgers worldwide by its (1) operation function (2) basic type (3) excavator suit for designated bottom (4) advantages and disadvantages. The working days of operation has to be determined in the beginning but it´s often affected by the environment change of operation site and the machine types and misleading of the situation which caused damage to the excavator and delay. As the result of this study maritime dredging operation are divided into inner harbor and outer harbor. The un-shelter operation is more difficult than inner shelter due to four major reasons:(1)sea weather condition(2)machine condition(3)miss operation(4) unreliable operation of underwater survey. If carefully planned to assigned proper type of dredger to the working site by considering weather and bottom condition the operation period could be greatly reduced and dredger efficiency will be improved to reach economic goal. Tien, Wen-Kwo Chang, Ki-Yin 田文國 張啓隱 2019 學位論文 ; thesis 94 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立臺灣海洋大學 === 商船學系 === 107 === The drawing of marine transportation brings up the development of shipping industry .According to the statistics from tech News published in December 2017, about 90%of the international trade is via shipping. Hence strengthening the constructions and scale has become an important. Particularly, the port has played an important role in transportation .With the demands of the huge size vessel in the global shipping markets; a large number of ports to accommodate to construct the large-scale port, Project of the large area is needed. However due to the outdated and small size dredger in Taiwan the majority of maritime projects rely mainly on the participation of dredgers from foreign countries. The construction environment is complex and full of variety in Taiwan. Taking newly built port for example digging of harbor basin fairway caisson foundation, the engineering geologic condition makes all the difference between success and failure. The duration of construction is greatly affected by efficiency of dredger which have varies of types. This study introduced dredgers worldwide by its (1) operation function (2) basic type (3) excavator suit for designated bottom (4) advantages and disadvantages. The working days of operation has to be determined in the beginning but it´s often affected by the environment change of operation site and the machine types and misleading of the situation which caused damage to the excavator and delay. As the result of this study maritime dredging operation are divided into inner harbor and outer harbor. The un-shelter operation is more difficult than inner shelter due to four major reasons:(1)sea weather condition(2)machine condition(3)miss operation(4) unreliable operation of underwater survey. If carefully planned to assigned proper type of dredger to the working site by considering weather and bottom condition the operation period could be greatly reduced and dredger efficiency will be improved to reach economic goal.
author2 Tien, Wen-Kwo
author_facet Tien, Wen-Kwo
Tzang,Chi-Tay
臧啟泰
author Tzang,Chi-Tay
臧啟泰
spellingShingle Tzang,Chi-Tay
臧啟泰
A Study for Technical Operation and Management of Marine Dredger
author_sort Tzang,Chi-Tay
title A Study for Technical Operation and Management of Marine Dredger
title_short A Study for Technical Operation and Management of Marine Dredger
title_full A Study for Technical Operation and Management of Marine Dredger
title_fullStr A Study for Technical Operation and Management of Marine Dredger
title_full_unstemmed A Study for Technical Operation and Management of Marine Dredger
title_sort study for technical operation and management of marine dredger
publishDate 2019
url http://ndltd.ncl.edu.tw/handle/yp4sdx
work_keys_str_mv AT tzangchitay astudyfortechnicaloperationandmanagementofmarinedredger
AT zāngqǐtài astudyfortechnicaloperationandmanagementofmarinedredger
AT tzangchitay wāníchuáncāozuòjìshùjíguǎnlǐzhīyánjiū
AT zāngqǐtài wāníchuáncāozuòjìshùjíguǎnlǐzhīyánjiū
AT tzangchitay studyfortechnicaloperationandmanagementofmarinedredger
AT zāngqǐtài studyfortechnicaloperationandmanagementofmarinedredger
_version_ 1719179055533654016