Feasibility Study on Reducing National Traffic Jam with Dynamic Ramp Fees--Taking National Road No. 5 as an Example
碩士 === 南華大學 === 旅遊管理學系旅遊管理碩士班 === 107 === National Highway No. 5 traffic jam is well known throughout the country. Although the government and the private sector have all envisaged a solution, they have not achieved results.This study attempts to propose a dynamic "ramp fee" charging sys...
Main Authors: | LI, NAN-CHANG, 李南昌 |
---|---|
Other Authors: | YU, CHIEN |
Format: | Others |
Language: | zh-TW |
Published: |
2019
|
Online Access: | http://ndltd.ncl.edu.tw/handle/wtfx39 |
Similar Items
-
Traffic forecasting on national roads
by: Jerzy Kukiełka
Published: (2012-06-01) -
Study on the Relationships Among Traffic Sign Setting, Road Main Facilities and Road Landscaping to Driving Perception Experience: Taking Taiwan National Road Expressway as an Example
by: CHINE, WEN-CHEN, et al.
Published: (2019) -
Developing model of toll road traffic forecasting during ramp-up period
by: Indra Dharmawan Weka, et al.
Published: (2019-01-01) -
National statistics of road traffic accidents in India
by: Manisha Ruikar
Published: (2013-01-01) -
The national burden of road traffic injuries in Thailand
by: Barendregt Jan J, et al.
Published: (2011-01-01)