Exploring the Factors Affecting the Progress Management of Public Engineering Adoption Professional Construction Management System by Using Modified Delphi Method and Analytic Hierarchy Process

碩士 === 國立交通大學 === 工學院工程技術與管理學程 === 107 === "Management behavior" provides modern society with knowledge, technology and tools in complex activities to achieve the control of budget costs and maximize the benefits of results, so management can be seen in human work and activities. In order...

Full description

Bibliographic Details
Main Authors: Huang, Shian-Cheng, 黃献誠
Other Authors: Hong, Shi-Lin
Format: Others
Language:zh-TW
Published: 2019
Online Access:http://ndltd.ncl.edu.tw/handle/8775k3
id ndltd-TW-107NCTU5027010
record_format oai_dc
spelling ndltd-TW-107NCTU50270102019-11-26T05:16:52Z http://ndltd.ncl.edu.tw/handle/8775k3 Exploring the Factors Affecting the Progress Management of Public Engineering Adoption Professional Construction Management System by Using Modified Delphi Method and Analytic Hierarchy Process 運用修正式德菲法及層級分析法(AHP)探究公共工程採行專業營建管理制度對於進度管理之影響 Huang, Shian-Cheng 黃献誠 碩士 國立交通大學 工學院工程技術與管理學程 107 "Management behavior" provides modern society with knowledge, technology and tools in complex activities to achieve the control of budget costs and maximize the benefits of results, so management can be seen in human work and activities. In order to avoid many unreasonable price contracting projects in the past, the government has actively implemented the most advantageous bidding method for large-scale project cases in recent years. However, the amount of project cases is larger and the composition of professional division of labor is more complex. In order to effectively control budget execution and time limit management, the government organs need to do so. The professional construction management units are entrusted with standardized and efficient management methods to carry out project management. However, in practice, the professional construction management units often have disputes on work execution due to different perceptions, such as work content, role power, information transformation, and even become the cause of overall project delays and inefficient execution. In view of this, this study will analyze the causes of poor schedule management, so as to provide early risk prevention and schedule control for future construction industry. In this study, real public works cases are taken as the object of discussion. Through the way of performance disputes and literature collection, a "power and responsibility division table" of 61 projects in five working stages is compiled. Based on the questionnaire, experts in the field of professional construction management are given Modified Delphi Method (MDM) and Analytic Hierarchy Process (AHP) by using the power and responsibility division table of project as the basis of the questionnaire analysis and research to find out the reasons affecting project schedule management. From the viewpoint of ten knowledge domains and five processes of PMBOK, this study analyses the factors that have adverse effects on the project schedule management. The results show that the "Critical path map" which affects the project schedule management mainly occurs in the "construction stage" followed by the "construction scheduled". Therefore, it can be seen that the Construction schedule or S-curve drawn before the construction of the project is importance of construction schedule planning. If the internal control factors of construction method, extreme climate, material supply, personnel dispatch and job cohesion are overlooked at the beginning, or the external factors of good-neighbourliness and owner's administrative procedures are neglected, the causes of the backward progress of the project will easily be buried. Hong, Shi-Lin Chen, Chun-Sheng 洪士林 陳春盛 2019 學位論文 ; thesis 126 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立交通大學 === 工學院工程技術與管理學程 === 107 === "Management behavior" provides modern society with knowledge, technology and tools in complex activities to achieve the control of budget costs and maximize the benefits of results, so management can be seen in human work and activities. In order to avoid many unreasonable price contracting projects in the past, the government has actively implemented the most advantageous bidding method for large-scale project cases in recent years. However, the amount of project cases is larger and the composition of professional division of labor is more complex. In order to effectively control budget execution and time limit management, the government organs need to do so. The professional construction management units are entrusted with standardized and efficient management methods to carry out project management. However, in practice, the professional construction management units often have disputes on work execution due to different perceptions, such as work content, role power, information transformation, and even become the cause of overall project delays and inefficient execution. In view of this, this study will analyze the causes of poor schedule management, so as to provide early risk prevention and schedule control for future construction industry. In this study, real public works cases are taken as the object of discussion. Through the way of performance disputes and literature collection, a "power and responsibility division table" of 61 projects in five working stages is compiled. Based on the questionnaire, experts in the field of professional construction management are given Modified Delphi Method (MDM) and Analytic Hierarchy Process (AHP) by using the power and responsibility division table of project as the basis of the questionnaire analysis and research to find out the reasons affecting project schedule management. From the viewpoint of ten knowledge domains and five processes of PMBOK, this study analyses the factors that have adverse effects on the project schedule management. The results show that the "Critical path map" which affects the project schedule management mainly occurs in the "construction stage" followed by the "construction scheduled". Therefore, it can be seen that the Construction schedule or S-curve drawn before the construction of the project is importance of construction schedule planning. If the internal control factors of construction method, extreme climate, material supply, personnel dispatch and job cohesion are overlooked at the beginning, or the external factors of good-neighbourliness and owner's administrative procedures are neglected, the causes of the backward progress of the project will easily be buried.
author2 Hong, Shi-Lin
author_facet Hong, Shi-Lin
Huang, Shian-Cheng
黃献誠
author Huang, Shian-Cheng
黃献誠
spellingShingle Huang, Shian-Cheng
黃献誠
Exploring the Factors Affecting the Progress Management of Public Engineering Adoption Professional Construction Management System by Using Modified Delphi Method and Analytic Hierarchy Process
author_sort Huang, Shian-Cheng
title Exploring the Factors Affecting the Progress Management of Public Engineering Adoption Professional Construction Management System by Using Modified Delphi Method and Analytic Hierarchy Process
title_short Exploring the Factors Affecting the Progress Management of Public Engineering Adoption Professional Construction Management System by Using Modified Delphi Method and Analytic Hierarchy Process
title_full Exploring the Factors Affecting the Progress Management of Public Engineering Adoption Professional Construction Management System by Using Modified Delphi Method and Analytic Hierarchy Process
title_fullStr Exploring the Factors Affecting the Progress Management of Public Engineering Adoption Professional Construction Management System by Using Modified Delphi Method and Analytic Hierarchy Process
title_full_unstemmed Exploring the Factors Affecting the Progress Management of Public Engineering Adoption Professional Construction Management System by Using Modified Delphi Method and Analytic Hierarchy Process
title_sort exploring the factors affecting the progress management of public engineering adoption professional construction management system by using modified delphi method and analytic hierarchy process
publishDate 2019
url http://ndltd.ncl.edu.tw/handle/8775k3
work_keys_str_mv AT huangshiancheng exploringthefactorsaffectingtheprogressmanagementofpublicengineeringadoptionprofessionalconstructionmanagementsystembyusingmodifieddelphimethodandanalytichierarchyprocess
AT huángxiànchéng exploringthefactorsaffectingtheprogressmanagementofpublicengineeringadoptionprofessionalconstructionmanagementsystembyusingmodifieddelphimethodandanalytichierarchyprocess
AT huangshiancheng yùnyòngxiūzhèngshìdéfēifǎjícéngjífēnxīfǎahptànjiūgōnggònggōngchéngcǎixíngzhuānyèyíngjiànguǎnlǐzhìdùduìyújìndùguǎnlǐzhīyǐngxiǎng
AT huángxiànchéng yùnyòngxiūzhèngshìdéfēifǎjícéngjífēnxīfǎahptànjiūgōnggònggōngchéngcǎixíngzhuānyèyíngjiànguǎnlǐzhìdùduìyújìndùguǎnlǐzhīyǐngxiǎng
_version_ 1719295689386622976