Bridge Foundation Earthquake Reinforcement Plan Appling Multi-Mode Space And Resource Constrain Scheduling
碩士 === 國立中興大學 === 土木工程學系所 === 107 === This study takes the seismic bridge reinforcement infrastructure of the National Freeway No. 3 Zhuoshui river bridge as study object, and its construction planning and scheduling has two approaches: First approach is the bottom-up way, from foundation to cap bea...
Main Authors: | Hung-Lin Lai, 賴宏林 |
---|---|
Other Authors: | 謝孟勳 |
Format: | Others |
Language: | zh-TW |
Published: |
2019
|
Online Access: | http://ndltd.ncl.edu.tw/handle/5zrqbu |
Similar Items
-
Optimization of bridge foundation construction schedule under resource and space constraints
by: Hung-Chang Wang, et al.
Published: (2019) -
Time and resource constrained scheduling, with applications to space station planning
by: Kurtzman, Clifford Roger
Published: (2007) -
A space-constrained resource-constrained scheduling system for multi-story buildings
by: Thabet, Walid
Published: (2014) -
Applying Genetic Algorithm to Multi-Mode Resource Constrained Multi-Project Scheduling Problems
by: Hung-Yu Lee, et al.
Published: (2009) -
The Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem
by: Denis Pinha, et al.
Published: (2016-11-01)