Discussion on the Regulations of the National Army's New Construction Project on Hillside Forest Land –Taking Taitung Base as An Example

碩士 === 高苑科技大學 === 土木工程研究所 === 107 === This study explores that the planned construction of the National Army's new construction project is located in the hillside forest land. Because it is planned to be in the soil and water conservation area, the water conservation plan must be submitted to t...

Full description

Bibliographic Details
Main Authors: Ye Bingchang, 葉炳昌
Other Authors: 呂意達
Format: Others
Language:zh-TW
Published: 2019
Online Access:http://ndltd.ncl.edu.tw/handle/h54v8w
id ndltd-TW-107KYIT0015005
record_format oai_dc
spelling ndltd-TW-107KYIT00150052019-08-04T03:37:33Z http://ndltd.ncl.edu.tw/handle/h54v8w Discussion on the Regulations of the National Army's New Construction Project on Hillside Forest Land –Taking Taitung Base as An Example 國軍在山坡林地新建工程之法規探討 -以臺東基地為例 Ye Bingchang 葉炳昌 碩士 高苑科技大學 土木工程研究所 107 This study explores that the planned construction of the National Army's new construction project is located in the hillside forest land. Because it is planned to be in the soil and water conservation area, the water conservation plan must be submitted to the Executive Soil and Water Conservation Bureau,Council of Agriculture,Executive Yuan Review for approval before the project can be started. In the soil and water conservation area, where there is a large drainage ditch in the hinterland of the construction, the area of the hinterland is insufficient. Therefore, it is planned to divert the road to meet the required area of the building. However, after the diversion, does the plan in line with the soil and water conservation slopes meet the regulatory requirements? This paper plans to use the soil and water conservation method, soil and water conservation technical specifications, soil and water conservation law implementation rules and soil and water conservation plan review and supervision methods, and conduct regulations analysis methods to check the water and soil conservation facilities, drainage and detention facilities, and slope stability. Facilities, retaining structures, etc., to ensure that the water protection facilities in the case meet the regulatory requirements. 呂意達 2019 學位論文 ; thesis 48 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 高苑科技大學 === 土木工程研究所 === 107 === This study explores that the planned construction of the National Army's new construction project is located in the hillside forest land. Because it is planned to be in the soil and water conservation area, the water conservation plan must be submitted to the Executive Soil and Water Conservation Bureau,Council of Agriculture,Executive Yuan Review for approval before the project can be started. In the soil and water conservation area, where there is a large drainage ditch in the hinterland of the construction, the area of the hinterland is insufficient. Therefore, it is planned to divert the road to meet the required area of the building. However, after the diversion, does the plan in line with the soil and water conservation slopes meet the regulatory requirements? This paper plans to use the soil and water conservation method, soil and water conservation technical specifications, soil and water conservation law implementation rules and soil and water conservation plan review and supervision methods, and conduct regulations analysis methods to check the water and soil conservation facilities, drainage and detention facilities, and slope stability. Facilities, retaining structures, etc., to ensure that the water protection facilities in the case meet the regulatory requirements.
author2 呂意達
author_facet 呂意達
Ye Bingchang
葉炳昌
author Ye Bingchang
葉炳昌
spellingShingle Ye Bingchang
葉炳昌
Discussion on the Regulations of the National Army's New Construction Project on Hillside Forest Land –Taking Taitung Base as An Example
author_sort Ye Bingchang
title Discussion on the Regulations of the National Army's New Construction Project on Hillside Forest Land –Taking Taitung Base as An Example
title_short Discussion on the Regulations of the National Army's New Construction Project on Hillside Forest Land –Taking Taitung Base as An Example
title_full Discussion on the Regulations of the National Army's New Construction Project on Hillside Forest Land –Taking Taitung Base as An Example
title_fullStr Discussion on the Regulations of the National Army's New Construction Project on Hillside Forest Land –Taking Taitung Base as An Example
title_full_unstemmed Discussion on the Regulations of the National Army's New Construction Project on Hillside Forest Land –Taking Taitung Base as An Example
title_sort discussion on the regulations of the national army's new construction project on hillside forest land –taking taitung base as an example
publishDate 2019
url http://ndltd.ncl.edu.tw/handle/h54v8w
work_keys_str_mv AT yebingchang discussionontheregulationsofthenationalarmysnewconstructionprojectonhillsideforestlandtakingtaitungbaseasanexample
AT yèbǐngchāng discussionontheregulationsofthenationalarmysnewconstructionprojectonhillsideforestlandtakingtaitungbaseasanexample
AT yebingchang guójūnzàishānpōlíndexīnjiàngōngchéngzhīfǎguītàntǎoyǐtáidōngjīdewèilì
AT yèbǐngchāng guójūnzàishānpōlíndexīnjiàngōngchéngzhīfǎguītàntǎoyǐtáidōngjīdewèilì
_version_ 1719232690624921600