The Prediction and 3D Numerical Analysis of Jacking Force for Microtunneling EPB Machine
碩士 === 國立臺北科技大學 === 土木工程系土木與防災碩士班 === 106 === Due to the commencement of the green building material in 2004 in Taiwan, there has been good coordination with the “National Primary Plan for Energy Conservation and Carbon Reduction” carried out by the Executive Yuan in April 2010 which has ambition to...
Main Author: | Nevillle Mc Artjir Demus |
---|---|
Other Authors: | 陳水龍 |
Format: | Others |
Language: | en_US |
Published: |
2018
|
Online Access: | http://ndltd.ncl.edu.tw/handle/jmay6j |
Similar Items
-
Analysis of Jacking force for EPB
by: Yi-Zhi Cai, et al. -
Pilot Tube Microtunneling: Instrumentation and Monitoring for Jacking Force and Productivity Analysis
Published: (2013) -
Developments and research directions in pipe jacking and microtunneling
by: Raymond L. Sterling
Published: (2020-03-01) -
Numerical Simulation for Estimation of the Jacking Force of Pipe Jacking
by: Chun-Hsing Yen, et al.
Published: (2015) -
The study of trajectory control for microtunnelling in gravel formation
by: Yu-Chang Tsai, et al.
Published: (2009)