Establishment of a Risk-Based Potential Hazard Index for Mechanical Electrical and Plumbing System
碩士 === 國立臺北科技大學 === 土木工程系土木與防災碩士班 === 106 === The MEP (Mechanical Electrical and Plumbing) system is failure of the system supply and disaster. There have been many studies to define potential changes in long extension of time. Including variations in types of equipment, system structure and system...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2017
|
Online Access: | http://ndltd.ncl.edu.tw/handle/tw4ntn |
id |
ndltd-TW-106TIT05653001 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-106TIT056530012019-05-16T00:22:33Z http://ndltd.ncl.edu.tw/handle/tw4ntn Establishment of a Risk-Based Potential Hazard Index for Mechanical Electrical and Plumbing System 從風險角度建立機電系統潛勢危害指標 Po-Yu Wu 吳伯瑜 碩士 國立臺北科技大學 土木工程系土木與防災碩士班 106 The MEP (Mechanical Electrical and Plumbing) system is failure of the system supply and disaster. There have been many studies to define potential changes in long extension of time. Including variations in types of equipment, system structure and system operation impact by process machine. These reports include actuate mathematic analysis and simulations. Most of the focus on the specific object. All views for MEP system comprehensive assessment also focus on qualitative assessment. Pass through the experience of electromechanical system professionals insurance practitioners and the actual operation of the system. Collect any possible hazard from MEP factor. The use of table classification, mathematics of grouped weight calculation method. Proposed a set of percentage of quantitative indicators for MEP potential hazard, importing the model to nine projects. Final case index values mapping to verify the site actual situation. The index includes three sub-index and a main index, the management index, construction index and maintenance operation index are the three sub-index. The main index is the MEP system potential hazard index. It can provide data to decision makers as the focus of future implementation. In addition, it also can support application reference of insurance. Cheng-Ping Lin 林正平 2017 學位論文 ; thesis 48 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立臺北科技大學 === 土木工程系土木與防災碩士班 === 106 === The MEP (Mechanical Electrical and Plumbing) system is failure of the system supply and disaster. There have been many studies to define potential changes in long extension of time. Including variations in types of equipment, system structure and system operation impact by process machine. These reports include actuate mathematic analysis and simulations. Most of the focus on the specific object. All views for MEP system comprehensive assessment also focus on qualitative assessment.
Pass through the experience of electromechanical system professionals insurance practitioners and the actual operation of the system. Collect any possible hazard from MEP factor. The use of table classification, mathematics of grouped weight calculation method. Proposed a set of percentage of quantitative indicators for MEP potential hazard, importing the model to nine projects. Final case index values mapping to verify the site actual situation.
The index includes three sub-index and a main index, the management index, construction index and maintenance operation index are the three sub-index. The main index is the MEP system potential hazard index. It can provide data to decision makers as the focus of future implementation. In addition, it also can support application reference of insurance.
|
author2 |
Cheng-Ping Lin |
author_facet |
Cheng-Ping Lin Po-Yu Wu 吳伯瑜 |
author |
Po-Yu Wu 吳伯瑜 |
spellingShingle |
Po-Yu Wu 吳伯瑜 Establishment of a Risk-Based Potential Hazard Index for Mechanical Electrical and Plumbing System |
author_sort |
Po-Yu Wu |
title |
Establishment of a Risk-Based Potential Hazard Index for Mechanical Electrical and Plumbing System |
title_short |
Establishment of a Risk-Based Potential Hazard Index for Mechanical Electrical and Plumbing System |
title_full |
Establishment of a Risk-Based Potential Hazard Index for Mechanical Electrical and Plumbing System |
title_fullStr |
Establishment of a Risk-Based Potential Hazard Index for Mechanical Electrical and Plumbing System |
title_full_unstemmed |
Establishment of a Risk-Based Potential Hazard Index for Mechanical Electrical and Plumbing System |
title_sort |
establishment of a risk-based potential hazard index for mechanical electrical and plumbing system |
publishDate |
2017 |
url |
http://ndltd.ncl.edu.tw/handle/tw4ntn |
work_keys_str_mv |
AT poyuwu establishmentofariskbasedpotentialhazardindexformechanicalelectricalandplumbingsystem AT wúbóyú establishmentofariskbasedpotentialhazardindexformechanicalelectricalandplumbingsystem AT poyuwu cóngfēngxiǎnjiǎodùjiànlìjīdiànxìtǒngqiánshìwēihàizhǐbiāo AT wúbóyú cóngfēngxiǎnjiǎodùjiànlìjīdiànxìtǒngqiánshìwēihàizhǐbiāo |
_version_ |
1719164622543519744 |