Improving Stock Preparation based on Sluggish Inventory of Spare Parts in PCB Production Equipment - A Case Study of U Company
碩士 === 國立臺北科技大學 === 管理學院資訊與財金管理EMBA專班 === 107 === The cost control of the Printed Circuit Board foundry is one of the key core of production competitiveness, and the equipment used in manufacturing and manufacturing has a wide variety of spare parts and high cost. The frequency of replacement of...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2019
|
Online Access: | http://ndltd.ncl.edu.tw/handle/q8w9ks |
id |
ndltd-TW-106TIT0030A008 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-106TIT0030A0082019-11-02T05:27:16Z http://ndltd.ncl.edu.tw/handle/q8w9ks Improving Stock Preparation based on Sluggish Inventory of Spare Parts in PCB Production Equipment - A Case Study of U Company 以PCB生產設備零備件呆滯庫存狀況探討備料方式之改善-以個案U公司為例 WU, JUI-WEN 吳瑞文 碩士 國立臺北科技大學 管理學院資訊與財金管理EMBA專班 107 The cost control of the Printed Circuit Board foundry is one of the key core of production competitiveness, and the equipment used in manufacturing and manufacturing has a wide variety of spare parts and high cost. The frequency of replacement of parts is difficult to predict accurately. Maintaining the proper rate and cost control of production equipment has always been a problem for printed circuit board foundries. At present, the Printed Circuit Board industry has mostly divided the spare parts into preventive maintenance spare parts and maintenance spare parts for the practice of inventory management of spare parts in production equipment. This study hopes to analyze U company’s current production equipment spare parts inventory management by means of a systematic approach, with an attempt to explore how to reduce effectively the amount of spare parts and amount of production equipment spare parts. FAN, MORRIS 范書愷 2019 學位論文 ; thesis 48 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立臺北科技大學 === 管理學院資訊與財金管理EMBA專班 === 107 === The cost control of the Printed Circuit Board foundry is one of the key core of production competitiveness, and the equipment used in manufacturing and manufacturing has a wide variety of spare parts and high cost. The frequency of replacement of parts is difficult to predict accurately. Maintaining the proper rate and cost control of production equipment has always been a problem for printed circuit board foundries.
At present, the Printed Circuit Board industry has mostly divided the spare parts into preventive maintenance spare parts and maintenance spare parts for the practice of inventory management of spare parts in production equipment. This study hopes to analyze U company’s current production equipment spare parts inventory management by means of a systematic approach, with an attempt to explore how to reduce effectively the amount of spare parts and amount of production equipment spare parts.
|
author2 |
FAN, MORRIS |
author_facet |
FAN, MORRIS WU, JUI-WEN 吳瑞文 |
author |
WU, JUI-WEN 吳瑞文 |
spellingShingle |
WU, JUI-WEN 吳瑞文 Improving Stock Preparation based on Sluggish Inventory of Spare Parts in PCB Production Equipment - A Case Study of U Company |
author_sort |
WU, JUI-WEN |
title |
Improving Stock Preparation based on Sluggish Inventory of Spare Parts in PCB Production Equipment - A Case Study of U Company |
title_short |
Improving Stock Preparation based on Sluggish Inventory of Spare Parts in PCB Production Equipment - A Case Study of U Company |
title_full |
Improving Stock Preparation based on Sluggish Inventory of Spare Parts in PCB Production Equipment - A Case Study of U Company |
title_fullStr |
Improving Stock Preparation based on Sluggish Inventory of Spare Parts in PCB Production Equipment - A Case Study of U Company |
title_full_unstemmed |
Improving Stock Preparation based on Sluggish Inventory of Spare Parts in PCB Production Equipment - A Case Study of U Company |
title_sort |
improving stock preparation based on sluggish inventory of spare parts in pcb production equipment - a case study of u company |
publishDate |
2019 |
url |
http://ndltd.ncl.edu.tw/handle/q8w9ks |
work_keys_str_mv |
AT wujuiwen improvingstockpreparationbasedonsluggishinventoryofsparepartsinpcbproductionequipmentacasestudyofucompany AT wúruìwén improvingstockpreparationbasedonsluggishinventoryofsparepartsinpcbproductionequipmentacasestudyofucompany AT wujuiwen yǐpcbshēngchǎnshèbèilíngbèijiàndāizhìkùcúnzhuàngkuàngtàntǎobèiliàofāngshìzhīgǎishànyǐgèànugōngsīwèilì AT wúruìwén yǐpcbshēngchǎnshèbèilíngbèijiàndāizhìkùcúnzhuàngkuàngtàntǎobèiliàofāngshìzhīgǎishànyǐgèànugōngsīwèilì |
_version_ |
1719285345461207040 |