The establishment of U-shape assembly line with multi-tasking operators-A case study of railing rack assembly line

碩士 === 國立虎尾科技大學 === 工業管理系工業工程與管理碩士班 === 106 === Recently, many traditional small & medium enterprises are facing small-volume large-variety needs, which requires flexible assembly line. Many traditional factories choose to introduce lean for one-off through improvement, but without significant p...

Full description

Bibliographic Details
Main Authors: WANG, HAO-XUAN, 王晧宣
Other Authors: GU, RUI-XIANG
Format: Others
Language:zh-TW
Published: 2018
Online Access:http://ndltd.ncl.edu.tw/handle/a5dan5
id ndltd-TW-106NYPI0030004
record_format oai_dc
spelling ndltd-TW-106NYPI00300042019-05-16T00:22:58Z http://ndltd.ncl.edu.tw/handle/a5dan5 The establishment of U-shape assembly line with multi-tasking operators-A case study of railing rack assembly line U型多能工組裝線之建構研究-以車頂橫樑架組裝線為例 WANG, HAO-XUAN 王晧宣 碩士 國立虎尾科技大學 工業管理系工業工程與管理碩士班 106 Recently, many traditional small & medium enterprises are facing small-volume large-variety needs, which requires flexible assembly line. Many traditional factories choose to introduce lean for one-off through improvement, but without significant performance and more cost waste. This thesis presents a single case analysis, to combine lean thoughts and practical assembly line. Focus on the assembly line procedure and layout by using process chart to establish a U-shape multi-tasking layout procedure. To expect following purposes: (1) To reduce case assembly line manpower needs, assemble line balancing improvement. (2) To carry out U-shape layout, material reconfigure, assembly line & total moving distance shorten. (3) To add muti-tasking operators for case assembly line, increase support capability. After the results of the study: improved layout can reduce 3 operator needs. With the reconfiguration of new layout, material and u-line: two of the operators are promote to muti-tasking operators, total moving distance reduce 25.35%, assembly line area reduce 14.92% and assemble line balance rate improved from 77.29% to 92.06%. GU, RUI-XIANG 顧瑞祥 2018 學位論文 ; thesis 87 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立虎尾科技大學 === 工業管理系工業工程與管理碩士班 === 106 === Recently, many traditional small & medium enterprises are facing small-volume large-variety needs, which requires flexible assembly line. Many traditional factories choose to introduce lean for one-off through improvement, but without significant performance and more cost waste. This thesis presents a single case analysis, to combine lean thoughts and practical assembly line. Focus on the assembly line procedure and layout by using process chart to establish a U-shape multi-tasking layout procedure. To expect following purposes: (1) To reduce case assembly line manpower needs, assemble line balancing improvement. (2) To carry out U-shape layout, material reconfigure, assembly line & total moving distance shorten. (3) To add muti-tasking operators for case assembly line, increase support capability. After the results of the study: improved layout can reduce 3 operator needs. With the reconfiguration of new layout, material and u-line: two of the operators are promote to muti-tasking operators, total moving distance reduce 25.35%, assembly line area reduce 14.92% and assemble line balance rate improved from 77.29% to 92.06%.
author2 GU, RUI-XIANG
author_facet GU, RUI-XIANG
WANG, HAO-XUAN
王晧宣
author WANG, HAO-XUAN
王晧宣
spellingShingle WANG, HAO-XUAN
王晧宣
The establishment of U-shape assembly line with multi-tasking operators-A case study of railing rack assembly line
author_sort WANG, HAO-XUAN
title The establishment of U-shape assembly line with multi-tasking operators-A case study of railing rack assembly line
title_short The establishment of U-shape assembly line with multi-tasking operators-A case study of railing rack assembly line
title_full The establishment of U-shape assembly line with multi-tasking operators-A case study of railing rack assembly line
title_fullStr The establishment of U-shape assembly line with multi-tasking operators-A case study of railing rack assembly line
title_full_unstemmed The establishment of U-shape assembly line with multi-tasking operators-A case study of railing rack assembly line
title_sort establishment of u-shape assembly line with multi-tasking operators-a case study of railing rack assembly line
publishDate 2018
url http://ndltd.ncl.edu.tw/handle/a5dan5
work_keys_str_mv AT wanghaoxuan theestablishmentofushapeassemblylinewithmultitaskingoperatorsacasestudyofrailingrackassemblyline
AT wánghàoxuān theestablishmentofushapeassemblylinewithmultitaskingoperatorsacasestudyofrailingrackassemblyline
AT wanghaoxuan uxíngduōnénggōngzǔzhuāngxiànzhījiàngòuyánjiūyǐchēdǐnghéngliángjiàzǔzhuāngxiànwèilì
AT wánghàoxuān uxíngduōnénggōngzǔzhuāngxiànzhījiàngòuyánjiūyǐchēdǐnghéngliángjiàzǔzhuāngxiànwèilì
AT wanghaoxuan establishmentofushapeassemblylinewithmultitaskingoperatorsacasestudyofrailingrackassemblyline
AT wánghàoxuān establishmentofushapeassemblylinewithmultitaskingoperatorsacasestudyofrailingrackassemblyline
_version_ 1719166011850096640