The establishment of U-shape assembly line with multi-tasking operators-A case study of railing rack assembly line
碩士 === 國立虎尾科技大學 === 工業管理系工業工程與管理碩士班 === 106 === Recently, many traditional small & medium enterprises are facing small-volume large-variety needs, which requires flexible assembly line. Many traditional factories choose to introduce lean for one-off through improvement, but without significant p...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2018
|
Online Access: | http://ndltd.ncl.edu.tw/handle/a5dan5 |
id |
ndltd-TW-106NYPI0030004 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-106NYPI00300042019-05-16T00:22:58Z http://ndltd.ncl.edu.tw/handle/a5dan5 The establishment of U-shape assembly line with multi-tasking operators-A case study of railing rack assembly line U型多能工組裝線之建構研究-以車頂橫樑架組裝線為例 WANG, HAO-XUAN 王晧宣 碩士 國立虎尾科技大學 工業管理系工業工程與管理碩士班 106 Recently, many traditional small & medium enterprises are facing small-volume large-variety needs, which requires flexible assembly line. Many traditional factories choose to introduce lean for one-off through improvement, but without significant performance and more cost waste. This thesis presents a single case analysis, to combine lean thoughts and practical assembly line. Focus on the assembly line procedure and layout by using process chart to establish a U-shape multi-tasking layout procedure. To expect following purposes: (1) To reduce case assembly line manpower needs, assemble line balancing improvement. (2) To carry out U-shape layout, material reconfigure, assembly line & total moving distance shorten. (3) To add muti-tasking operators for case assembly line, increase support capability. After the results of the study: improved layout can reduce 3 operator needs. With the reconfiguration of new layout, material and u-line: two of the operators are promote to muti-tasking operators, total moving distance reduce 25.35%, assembly line area reduce 14.92% and assemble line balance rate improved from 77.29% to 92.06%. GU, RUI-XIANG 顧瑞祥 2018 學位論文 ; thesis 87 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立虎尾科技大學 === 工業管理系工業工程與管理碩士班 === 106 === Recently, many traditional small & medium enterprises are facing small-volume large-variety needs, which requires flexible assembly line. Many traditional factories choose to introduce lean for one-off through improvement, but without significant performance and more cost waste. This thesis presents a single case analysis, to combine lean thoughts and practical assembly line. Focus on the assembly line procedure and layout by using process chart to establish a U-shape multi-tasking layout procedure. To expect following purposes: (1) To reduce case assembly line manpower needs, assemble line balancing improvement. (2) To carry out U-shape layout, material reconfigure, assembly line & total moving distance shorten. (3) To add muti-tasking operators for case assembly line, increase support capability.
After the results of the study: improved layout can reduce 3 operator needs. With the reconfiguration of new layout, material and u-line: two of the operators are promote to muti-tasking operators, total moving distance reduce 25.35%, assembly line area reduce 14.92% and assemble line balance rate improved from 77.29% to 92.06%.
|
author2 |
GU, RUI-XIANG |
author_facet |
GU, RUI-XIANG WANG, HAO-XUAN 王晧宣 |
author |
WANG, HAO-XUAN 王晧宣 |
spellingShingle |
WANG, HAO-XUAN 王晧宣 The establishment of U-shape assembly line with multi-tasking operators-A case study of railing rack assembly line |
author_sort |
WANG, HAO-XUAN |
title |
The establishment of U-shape assembly line with multi-tasking operators-A case study of railing rack assembly line |
title_short |
The establishment of U-shape assembly line with multi-tasking operators-A case study of railing rack assembly line |
title_full |
The establishment of U-shape assembly line with multi-tasking operators-A case study of railing rack assembly line |
title_fullStr |
The establishment of U-shape assembly line with multi-tasking operators-A case study of railing rack assembly line |
title_full_unstemmed |
The establishment of U-shape assembly line with multi-tasking operators-A case study of railing rack assembly line |
title_sort |
establishment of u-shape assembly line with multi-tasking operators-a case study of railing rack assembly line |
publishDate |
2018 |
url |
http://ndltd.ncl.edu.tw/handle/a5dan5 |
work_keys_str_mv |
AT wanghaoxuan theestablishmentofushapeassemblylinewithmultitaskingoperatorsacasestudyofrailingrackassemblyline AT wánghàoxuān theestablishmentofushapeassemblylinewithmultitaskingoperatorsacasestudyofrailingrackassemblyline AT wanghaoxuan uxíngduōnénggōngzǔzhuāngxiànzhījiàngòuyánjiūyǐchēdǐnghéngliángjiàzǔzhuāngxiànwèilì AT wánghàoxuān uxíngduōnénggōngzǔzhuāngxiànzhījiàngòuyánjiūyǐchēdǐnghéngliángjiàzǔzhuāngxiànwèilì AT wanghaoxuan establishmentofushapeassemblylinewithmultitaskingoperatorsacasestudyofrailingrackassemblyline AT wánghàoxuān establishmentofushapeassemblylinewithmultitaskingoperatorsacasestudyofrailingrackassemblyline |
_version_ |
1719166011850096640 |