Microcrack Development of Circular Tunnel and Horseshoe Tunnel Excavation under Intact Rock Mass.

碩士 === 國立臺灣科技大學 === 營建工程系 === 106 === In this study, the PFC2D code was used to explore the circular tunnel and horseshoe tunnel with four different overburden depths (H=300, 400, 500, 600 m).The tunnel was excavated in a hard rock (granite), and the whole section was excavated without support. The...

Full description

Bibliographic Details
Main Authors: Chun-Min Yang, 楊浚旻
Other Authors: Chee-Nan Chen
Format: Others
Language:zh-TW
Published: 2018
Online Access:http://ndltd.ncl.edu.tw/handle/9ubwtx