Influence of Bidding Document on the Delay of Public Building Construction Using Analytic Hierachy Process

碩士 === 國立臺灣科技大學 === 營建工程系 === 106 === In order to achieve a balance between quality and cost to create a sustainable building space, the construction project is required to pay more attention to the management of construction period, quality and safety at various stages. In view of the current ways...

Full description

Bibliographic Details
Main Authors: Hui-Chuan Tseng, 曾慧娟
Other Authors: Ta-Peng Chang
Format: Others
Language:zh-TW
Published: 2018
Online Access:http://ndltd.ncl.edu.tw/handle/g3v6u3
id ndltd-TW-106NTUS5512080
record_format oai_dc
spelling ndltd-TW-106NTUS55120802019-05-16T00:59:40Z http://ndltd.ncl.edu.tw/handle/g3v6u3 Influence of Bidding Document on the Delay of Public Building Construction Using Analytic Hierachy Process 以層級分析法探討公共建築工程招標文件對工程遲延之影響 Hui-Chuan Tseng 曾慧娟 碩士 國立臺灣科技大學 營建工程系 106 In order to achieve a balance between quality and cost to create a sustainable building space, the construction project is required to pay more attention to the management of construction period, quality and safety at various stages. In view of the current ways to process the construction delays in domestic public construction projects, it is often treated by trement measurements such as the change of design, extension of schedule or compensation of management fee, or by means of the charge of delay penaty to the contractors. However, no matter what kind of treatment measurements is used, it cannot change the fact that these measuremtns result the influence on the delay of engineering project. Therefore, this study explores the influence factors that cause the construction delay at the tendering stage in order to prompt the planning and design unit to review the completion degree of the bidding documents and propose more suitable content. Therefore, it is expected to improve the performance process of construction project by controlling the beginning source to allivate the unnecessary change of design or construction disputes . Ta-Peng Chang 張大鵬 2018 學位論文 ; thesis 184 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立臺灣科技大學 === 營建工程系 === 106 === In order to achieve a balance between quality and cost to create a sustainable building space, the construction project is required to pay more attention to the management of construction period, quality and safety at various stages. In view of the current ways to process the construction delays in domestic public construction projects, it is often treated by trement measurements such as the change of design, extension of schedule or compensation of management fee, or by means of the charge of delay penaty to the contractors. However, no matter what kind of treatment measurements is used, it cannot change the fact that these measuremtns result the influence on the delay of engineering project. Therefore, this study explores the influence factors that cause the construction delay at the tendering stage in order to prompt the planning and design unit to review the completion degree of the bidding documents and propose more suitable content. Therefore, it is expected to improve the performance process of construction project by controlling the beginning source to allivate the unnecessary change of design or construction disputes .
author2 Ta-Peng Chang
author_facet Ta-Peng Chang
Hui-Chuan Tseng
曾慧娟
author Hui-Chuan Tseng
曾慧娟
spellingShingle Hui-Chuan Tseng
曾慧娟
Influence of Bidding Document on the Delay of Public Building Construction Using Analytic Hierachy Process
author_sort Hui-Chuan Tseng
title Influence of Bidding Document on the Delay of Public Building Construction Using Analytic Hierachy Process
title_short Influence of Bidding Document on the Delay of Public Building Construction Using Analytic Hierachy Process
title_full Influence of Bidding Document on the Delay of Public Building Construction Using Analytic Hierachy Process
title_fullStr Influence of Bidding Document on the Delay of Public Building Construction Using Analytic Hierachy Process
title_full_unstemmed Influence of Bidding Document on the Delay of Public Building Construction Using Analytic Hierachy Process
title_sort influence of bidding document on the delay of public building construction using analytic hierachy process
publishDate 2018
url http://ndltd.ncl.edu.tw/handle/g3v6u3
work_keys_str_mv AT huichuantseng influenceofbiddingdocumentonthedelayofpublicbuildingconstructionusinganalytichierachyprocess
AT cénghuìjuān influenceofbiddingdocumentonthedelayofpublicbuildingconstructionusinganalytichierachyprocess
AT huichuantseng yǐcéngjífēnxīfǎtàntǎogōnggòngjiànzhúgōngchéngzhāobiāowénjiànduìgōngchéngchíyánzhīyǐngxiǎng
AT cénghuìjuān yǐcéngjífēnxīfǎtàntǎogōnggòngjiànzhúgōngchéngzhāobiāowénjiànduìgōngchéngchíyánzhīyǐngxiǎng
_version_ 1719172506346061824