Summary: | 碩士 === 國立臺灣科技大學 === 營建工程系 === 106 === In order to achieve a balance between quality and cost to create a sustainable building space, the construction project is required to pay more attention to the management of construction period, quality and safety at various stages. In view of the current ways to process the construction delays in domestic public construction projects, it is often treated by trement measurements such as the change of design, extension of schedule or compensation of management fee, or by means of the charge of delay penaty to the contractors. However, no matter what kind of treatment measurements is used, it cannot change the fact that these measuremtns result the influence on the delay of engineering project. Therefore, this study explores the influence factors that cause the construction delay at the tendering stage in order to prompt the planning and design unit to review the completion degree of the bidding documents and propose more suitable content. Therefore, it is expected to improve the performance process of construction project by controlling the beginning source to allivate the unnecessary change of design or construction disputes .
|