The Research on Customized Prefabrication Method for High End Interior Construction -A Case Study of Elevator Lobby-
碩士 === 國立臺灣大學 === 土木工程學研究所 === 106 === Operating costs of the construction industry are affected by factors such as construction materials and labor costs. Construction as a part of the construction industry is also deeply affected by the aforementioned factors. Samuel Yin (2016) mentioned that the...
Main Authors: | Hui-Ching Chen, 陳慧菁 |
---|---|
Other Authors: | 曾惠斌 |
Format: | Others |
Language: | zh-TW |
Published: |
2018
|
Online Access: | http://ndltd.ncl.edu.tw/handle/5k54ab |
Similar Items
-
Artistic Articulation of Interior Iighting for Hotels Lobby
by: Akram Jassim Al-Akkam, et al.
Published: (2018-12-01) -
The evolution of prefabricated interior components for post-occupancy modification /
by: Ou, Yangli, 1968-
Published: (1999) -
First impressions of the interiors of hotel lobbies as influences on perceptions of hotels
by: Fidzani, Lily Clara
Published: (2012) -
A Study of Apartment Condominium Lobby Appearance and Interior Decoration
by: Yi-An Chien, et al.
Published: (2015) -
LOGISTICS RISK RESEARCH OF PREFABRICATED HOUSE CONSTRUCTION ENGINEERING BASED ON CREDIBILITY METHOD
by: Xiaoping Bai, et al.
Published: (2017-07-01)