Optimization of Short-Term Track Utilization and Maintenance Scheduling
碩士 === 國立臺灣大學 === 土木工程學研究所 === 106 === For railway company in Taiwan, track maintenance tasks are usually scheduled during non-service hours (from midnight to early morning); however, this constraint may incur high labor costs and insufficient maintenance time. This study constructs a novel time-spa...
Main Authors: | Tzu-Hao Yan, 顏子皓 |
---|---|
Other Authors: | 賴勇成 |
Format: | Others |
Language: | en_US |
Published: |
2018
|
Online Access: | http://ndltd.ncl.edu.tw/handle/t94zu8 |
Similar Items
-
Developing an Enhanced Short-Range Railroad Track Condition Prediction Model for Optimal Maintenance Scheduling
by: Peng Xu, et al.
Published: (2015-01-01) -
Short Term Maintenance Tasks Scheduling with Pinch Methodology
by: Hon Huin Chin, et al.
Published: (2020-02-01) -
Optimal Adjust Scheduling Models for Incident Aircraft Maintenance Terminals in Short-Term Operations
by: Yu-ching Chen, et al.
Published: (2007) -
The Short-term Working Team Scheduling Models for Road Maintenance
by: Chia-Wei Chang, et al.
Published: (2006) -
Short-Term Line Maintenance Scheduling of Distribution Network With PV Penetration Considering Uncertainties
by: Zhejing Bao, et al.
Published: (2018-01-01)