THE FEASIBILITY ANALYSIS FOR A DYEING FACTORY ADOPTING ADVANCED PLANNING & SCHEDULING SYSTEM (APS) – A CASE STUDY OF A PIECE DYED KNITTING FABRIC DYEING FACTORY

碩士 === 國立中央大學 === 資訊管理學系在職專班 === 106 === The textile industry in Taiwan has been progressing in the past 60 years; however, the fabric manufacturer has challenged dyeing factories for delaying the manufacturing process most of the time. This study attempts to identify the challenges that a dyeing fa...

Full description

Bibliographic Details
Main Authors: Yu-Hsun Kuan, 關宇珣
Other Authors: Eric T.G. Wang
Format: Others
Language:zh-TW
Published: 2018
Online Access:http://ndltd.ncl.edu.tw/handle/yp8q56
id ndltd-TW-106NCU05396038
record_format oai_dc
spelling ndltd-TW-106NCU053960382019-10-31T05:22:23Z http://ndltd.ncl.edu.tw/handle/yp8q56 THE FEASIBILITY ANALYSIS FOR A DYEING FACTORY ADOPTING ADVANCED PLANNING & SCHEDULING SYSTEM (APS) – A CASE STUDY OF A PIECE DYED KNITTING FABRIC DYEING FACTORY 染整廠應用先進排程系統的可行性分析—以D染整廠為例 Yu-Hsun Kuan 關宇珣 碩士 國立中央大學 資訊管理學系在職專班 106 The textile industry in Taiwan has been progressing in the past 60 years; however, the fabric manufacturer has challenged dyeing factories for delaying the manufacturing process most of the time. This study attempts to identify the challenges that a dyeing factory has on manufacturing scheduling. Advanced Planning & Scheduling System (APS) is a scheduling system that can compute multiple factors to improve manufacturing efficiency. This study will evaluate the feasibility of adopting an APS to overcome the challenges. The research applies Leavitt’s Diamond Model and conducts a case study to identify the case company’s organizational structure, people’s responsibility, the manufacturing and the operating processes, the system-implementation history, the current scheduling logic that the company applies. The study also evaluates whether or not the current technology infrastructure can support the demand. Furthermore, the study further investigates if the APS is able to resolve the delay problem that the dyeing factory currently has, for helping the company make a solid decision on APS adoption. The results lead to several major findings. First, the delay problem the company is suffering has been caused by the insufficient capacity, and the remake has further over-loaded the capacity, leading to a vicious circle of delaying. The infrastructure and the database of the company are insufficient for automatically judge the color order depending on the depth, so it is not quite feasible for the company to adopt an APS currently. Instead, the company should build up more data basis, and further analyze the relationship between remake and various manufacturing factors that might interfere the scheduling. In the future, only when the infrastructure construction of information flow has been setup, can the scheduling be computed by simulation techniques, and the manager can do a relative more solid decision than before. Eric T.G. Wang 王存國 2018 學位論文 ; thesis 53 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立中央大學 === 資訊管理學系在職專班 === 106 === The textile industry in Taiwan has been progressing in the past 60 years; however, the fabric manufacturer has challenged dyeing factories for delaying the manufacturing process most of the time. This study attempts to identify the challenges that a dyeing factory has on manufacturing scheduling. Advanced Planning & Scheduling System (APS) is a scheduling system that can compute multiple factors to improve manufacturing efficiency. This study will evaluate the feasibility of adopting an APS to overcome the challenges. The research applies Leavitt’s Diamond Model and conducts a case study to identify the case company’s organizational structure, people’s responsibility, the manufacturing and the operating processes, the system-implementation history, the current scheduling logic that the company applies. The study also evaluates whether or not the current technology infrastructure can support the demand. Furthermore, the study further investigates if the APS is able to resolve the delay problem that the dyeing factory currently has, for helping the company make a solid decision on APS adoption. The results lead to several major findings. First, the delay problem the company is suffering has been caused by the insufficient capacity, and the remake has further over-loaded the capacity, leading to a vicious circle of delaying. The infrastructure and the database of the company are insufficient for automatically judge the color order depending on the depth, so it is not quite feasible for the company to adopt an APS currently. Instead, the company should build up more data basis, and further analyze the relationship between remake and various manufacturing factors that might interfere the scheduling. In the future, only when the infrastructure construction of information flow has been setup, can the scheduling be computed by simulation techniques, and the manager can do a relative more solid decision than before.
author2 Eric T.G. Wang
author_facet Eric T.G. Wang
Yu-Hsun Kuan
關宇珣
author Yu-Hsun Kuan
關宇珣
spellingShingle Yu-Hsun Kuan
關宇珣
THE FEASIBILITY ANALYSIS FOR A DYEING FACTORY ADOPTING ADVANCED PLANNING & SCHEDULING SYSTEM (APS) – A CASE STUDY OF A PIECE DYED KNITTING FABRIC DYEING FACTORY
author_sort Yu-Hsun Kuan
title THE FEASIBILITY ANALYSIS FOR A DYEING FACTORY ADOPTING ADVANCED PLANNING & SCHEDULING SYSTEM (APS) – A CASE STUDY OF A PIECE DYED KNITTING FABRIC DYEING FACTORY
title_short THE FEASIBILITY ANALYSIS FOR A DYEING FACTORY ADOPTING ADVANCED PLANNING & SCHEDULING SYSTEM (APS) – A CASE STUDY OF A PIECE DYED KNITTING FABRIC DYEING FACTORY
title_full THE FEASIBILITY ANALYSIS FOR A DYEING FACTORY ADOPTING ADVANCED PLANNING & SCHEDULING SYSTEM (APS) – A CASE STUDY OF A PIECE DYED KNITTING FABRIC DYEING FACTORY
title_fullStr THE FEASIBILITY ANALYSIS FOR A DYEING FACTORY ADOPTING ADVANCED PLANNING & SCHEDULING SYSTEM (APS) – A CASE STUDY OF A PIECE DYED KNITTING FABRIC DYEING FACTORY
title_full_unstemmed THE FEASIBILITY ANALYSIS FOR A DYEING FACTORY ADOPTING ADVANCED PLANNING & SCHEDULING SYSTEM (APS) – A CASE STUDY OF A PIECE DYED KNITTING FABRIC DYEING FACTORY
title_sort feasibility analysis for a dyeing factory adopting advanced planning & scheduling system (aps) – a case study of a piece dyed knitting fabric dyeing factory
publishDate 2018
url http://ndltd.ncl.edu.tw/handle/yp8q56
work_keys_str_mv AT yuhsunkuan thefeasibilityanalysisforadyeingfactoryadoptingadvancedplanningschedulingsystemapsacasestudyofapiecedyedknittingfabricdyeingfactory
AT guānyǔxún thefeasibilityanalysisforadyeingfactoryadoptingadvancedplanningschedulingsystemapsacasestudyofapiecedyedknittingfabricdyeingfactory
AT yuhsunkuan rǎnzhěngchǎngyīngyòngxiānjìnpáichéngxìtǒngdekěxíngxìngfēnxīyǐdrǎnzhěngchǎngwèilì
AT guānyǔxún rǎnzhěngchǎngyīngyòngxiānjìnpáichéngxìtǒngdekěxíngxìngfēnxīyǐdrǎnzhěngchǎngwèilì
AT yuhsunkuan feasibilityanalysisforadyeingfactoryadoptingadvancedplanningschedulingsystemapsacasestudyofapiecedyedknittingfabricdyeingfactory
AT guānyǔxún feasibilityanalysisforadyeingfactoryadoptingadvancedplanningschedulingsystemapsacasestudyofapiecedyedknittingfabricdyeingfactory
_version_ 1719284372125777920