none

碩士 === 國立中央大學 === 土木工程學系 === 106 === In order to actively expand their business, strengthen the scope of service users, and cooperate with various construction and implementation of pipeline underground engineering, each pipeline unit often applies to the road management unit to excavate roads and h...

Full description

Bibliographic Details
Main Authors: Chen-Chun Lin, 林陳儁
Other Authors: Jyh-Dong Lin
Format: Others
Language:zh-TW
Published: 2018
Online Access:http://ndltd.ncl.edu.tw/handle/9dpq72
id ndltd-TW-106NCU05015118
record_format oai_dc
spelling ndltd-TW-106NCU050151182019-09-12T03:37:43Z http://ndltd.ncl.edu.tw/handle/9dpq72 none 步進式平坦儀對維生管線施作後之平坦度檢測成效分析-以市區道路為例 Chen-Chun Lin 林陳儁 碩士 國立中央大學 土木工程學系 106 In order to actively expand their business, strengthen the scope of service users, and cooperate with various construction and implementation of pipeline underground engineering, each pipeline unit often applies to the road management unit to excavate roads and handle various pipeline embedding projects, resulting in frequent road excavation and road traffic. Interference, which in turn reduces the service life of the road. Moreover, the location of road excavation is everywhere, and it is difficult to supervise the manpower of the control, making the maintenance of road quality difficult. In the past, the repair of backfilled blocks, square milling, and road sections for road maintenance pipelines was not actively managed and there is no clear completion specification for reference. This study uses the new-type walking profiler to obtain the IRI value of the flatness index and the single point height and lowness, and analyzes the difference between the data and utilizes the data of the flatness of the road maintenance pipeline in the urban area of Taipei and Taoyuan. Classification of administrative areas and lengths, construction companies, etc., to analyze the effectiveness of walking profiler for road maintenance, and then analyze the difference between data and road types to discuss the relationship between construction methods and road types; The comprehensive survey of walking profiler has been effective in improving the quality and performance of overall road maintenance pipeline repair. Jyh-Dong Lin 林志棟 2018 學位論文 ; thesis 90 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立中央大學 === 土木工程學系 === 106 === In order to actively expand their business, strengthen the scope of service users, and cooperate with various construction and implementation of pipeline underground engineering, each pipeline unit often applies to the road management unit to excavate roads and handle various pipeline embedding projects, resulting in frequent road excavation and road traffic. Interference, which in turn reduces the service life of the road. Moreover, the location of road excavation is everywhere, and it is difficult to supervise the manpower of the control, making the maintenance of road quality difficult. In the past, the repair of backfilled blocks, square milling, and road sections for road maintenance pipelines was not actively managed and there is no clear completion specification for reference. This study uses the new-type walking profiler to obtain the IRI value of the flatness index and the single point height and lowness, and analyzes the difference between the data and utilizes the data of the flatness of the road maintenance pipeline in the urban area of Taipei and Taoyuan. Classification of administrative areas and lengths, construction companies, etc., to analyze the effectiveness of walking profiler for road maintenance, and then analyze the difference between data and road types to discuss the relationship between construction methods and road types; The comprehensive survey of walking profiler has been effective in improving the quality and performance of overall road maintenance pipeline repair.
author2 Jyh-Dong Lin
author_facet Jyh-Dong Lin
Chen-Chun Lin
林陳儁
author Chen-Chun Lin
林陳儁
spellingShingle Chen-Chun Lin
林陳儁
none
author_sort Chen-Chun Lin
title none
title_short none
title_full none
title_fullStr none
title_full_unstemmed none
title_sort none
publishDate 2018
url http://ndltd.ncl.edu.tw/handle/9dpq72
work_keys_str_mv AT chenchunlin none
AT línchénjùn none
AT chenchunlin bùjìnshìpíngtǎnyíduìwéishēngguǎnxiànshīzuòhòuzhīpíngtǎndùjiǎncèchéngxiàofēnxīyǐshìqūdàolùwèilì
AT línchénjùn bùjìnshìpíngtǎnyíduìwéishēngguǎnxiànshīzuòhòuzhīpíngtǎndùjiǎncèchéngxiàofēnxīyǐshìqūdàolùwèilì
_version_ 1719249942237675520