Assessing the technician requirement in a semiconductor fab-- A Monte-Carlo simulation approach
碩士 === 國立交通大學 === 管理學院工業工程與管理學程 === 106 === A 12-inch fab in the semiconductor manufacturing is highly automatic. The main task of technicians is to monitor the production systems, including tools and material handling system, and to resolve the unexpected production issues. On one hand, it needs su...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2018
|
Online Access: | http://ndltd.ncl.edu.tw/handle/hkukc7 |
id |
ndltd-TW-106NCTU5031057 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-106NCTU50310572019-05-16T01:24:31Z http://ndltd.ncl.edu.tw/handle/hkukc7 Assessing the technician requirement in a semiconductor fab-- A Monte-Carlo simulation approach 以蒙地卡羅模擬法評估半導體晶圓廠 技術員人力需求 Yen, Tsung-Jung 嚴宗榮 碩士 國立交通大學 管理學院工業工程與管理學程 106 A 12-inch fab in the semiconductor manufacturing is highly automatic. The main task of technicians is to monitor the production systems, including tools and material handling system, and to resolve the unexpected production issues. On one hand, it needs sufficient technicians to keep the production in a working condition, on the other hand, the company intends to reduce the workforce to increase the operational efficiency. The workforce planning or requirement assessment is challenging especially due to the uncertainty. In this study, we apply the Monte Carlo simulation to estimate the technician requirement. The approach proposed considers beyond the average requirement. It can provide the detailed probability distribution of the requirement as a clear aid to enhance the decision quality. Chen, Wen-Chih 陳文智 2018 學位論文 ; thesis 36 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立交通大學 === 管理學院工業工程與管理學程 === 106 === A 12-inch fab in the semiconductor manufacturing is highly automatic. The main task of technicians is to monitor the production systems, including tools and material handling system, and to resolve the unexpected production issues. On one hand, it needs sufficient technicians to keep the production in a working condition, on the other hand, the company intends to reduce the workforce to increase the operational efficiency. The workforce planning or requirement assessment is challenging especially due to the uncertainty.
In this study, we apply the Monte Carlo simulation to estimate the technician requirement. The approach proposed considers beyond the average requirement. It can provide the detailed probability distribution of the requirement as a clear aid to enhance the decision quality.
|
author2 |
Chen, Wen-Chih |
author_facet |
Chen, Wen-Chih Yen, Tsung-Jung 嚴宗榮 |
author |
Yen, Tsung-Jung 嚴宗榮 |
spellingShingle |
Yen, Tsung-Jung 嚴宗榮 Assessing the technician requirement in a semiconductor fab-- A Monte-Carlo simulation approach |
author_sort |
Yen, Tsung-Jung |
title |
Assessing the technician requirement in a semiconductor fab-- A Monte-Carlo simulation approach |
title_short |
Assessing the technician requirement in a semiconductor fab-- A Monte-Carlo simulation approach |
title_full |
Assessing the technician requirement in a semiconductor fab-- A Monte-Carlo simulation approach |
title_fullStr |
Assessing the technician requirement in a semiconductor fab-- A Monte-Carlo simulation approach |
title_full_unstemmed |
Assessing the technician requirement in a semiconductor fab-- A Monte-Carlo simulation approach |
title_sort |
assessing the technician requirement in a semiconductor fab-- a monte-carlo simulation approach |
publishDate |
2018 |
url |
http://ndltd.ncl.edu.tw/handle/hkukc7 |
work_keys_str_mv |
AT yentsungjung assessingthetechnicianrequirementinasemiconductorfabamontecarlosimulationapproach AT yánzōngróng assessingthetechnicianrequirementinasemiconductorfabamontecarlosimulationapproach AT yentsungjung yǐméngdekǎluómónǐfǎpínggūbàndǎotǐjīngyuánchǎngjìshùyuánrénlìxūqiú AT yánzōngróng yǐméngdekǎluómónǐfǎpínggūbàndǎotǐjīngyuánchǎngjìshùyuánrénlìxūqiú |
_version_ |
1719175448780341248 |