A Study of Public-Private Cooperation:The Case of “Puli Power Party Marathon”
碩士 === 國立暨南國際大學 === 公共行政與政策學系 === 106 === This is a study of the case of “Puli Power Party Marathon” with two of the main organizers, Puli Township Administration and 18°C Foundation. The research is going to discuss government departments and local industries’ objectives and reasons behind of using...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2018
|
Online Access: | http://ndltd.ncl.edu.tw/handle/9ac8yw |
id |
ndltd-TW-106NCNU0054013 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-106NCNU00540132019-05-16T00:37:29Z http://ndltd.ncl.edu.tw/handle/9ac8yw A Study of Public-Private Cooperation:The Case of “Puli Power Party Marathon” 公私部門協力合作之研究-以「埔里跑Puli Power山城派對馬拉松」為例 LIN, KUN-PIN 林坤濱 碩士 國立暨南國際大學 公共行政與政策學系 106 This is a study of the case of “Puli Power Party Marathon” with two of the main organizers, Puli Township Administration and 18°C Foundation. The research is going to discuss government departments and local industries’ objectives and reasons behind of using public- private partnerships during the organizing. Besides, we want to know more about the public- private cooperation’s interaction and (dis)advantages to analyze the effectiveness. Base on using the qualitative research method, the research would like to gathers first-hand information from documents analysis and the process of in- depth interviews to generalize the development of “Puli Power Party Marathon” and the usage of public- private partnerships. The opinions given by interviewees can help to induce the event’s development background, relationship in the public- private partnerships and also future expectations in order to archive the research purpose of this study. Research purpose: 1.The value of existence and contribution form partnership cooperation between government departments and local industries 2.With the case study to analyze partnership cooperation should continue or not 3.Spot out the dilemmas and provide suggestions Research results(1)Public- private partnerships model:Horizontal’s partner relationship with shared resources and responsibilities in order to get a win-win situation. (2)Reasons of the succeeded: Active participants with the same specific objectives built up a long term cooperation relationship.(3)Pros and Cons:Increase efficiency, lower cost and enhance the teams’ cohesion. Brainstorming together and solve the problems; Overdependence would be difficult to reach a consensus or even conflicts may appear. Research suggestions(1)Improve organizations’ management:Develop the source of funding for organizing the event, improve the coordination between volunteers and make transformation when in need.(2)Cooperation partnerships:Proactively build up a network, respect and trust both parties for long term cooperation. LIAO, CHUN-SUNG 廖俊松 2018 學位論文 ; thesis 172 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立暨南國際大學 === 公共行政與政策學系 === 106 === This is a study of the case of “Puli Power Party Marathon” with two of the main organizers, Puli Township Administration and 18°C Foundation. The research is going to discuss government departments and local industries’ objectives and reasons behind of using public- private partnerships during the organizing. Besides, we want to know more about the public- private cooperation’s interaction and (dis)advantages to analyze the effectiveness. Base on using the qualitative research method, the research would like to gathers first-hand information from documents analysis and the process of in- depth interviews to generalize the development of “Puli Power Party Marathon” and the usage of public- private partnerships. The opinions given by interviewees can help to induce the event’s development background, relationship in the public- private partnerships and also future expectations in order to archive the research purpose of this study.
Research purpose:
1.The value of existence and contribution form partnership cooperation between government departments and local industries
2.With the case study to analyze partnership cooperation should continue or not
3.Spot out the dilemmas and provide suggestions
Research results(1)Public- private partnerships model:Horizontal’s partner relationship with shared resources and responsibilities in order to get a win-win situation. (2)Reasons of the succeeded: Active participants with the same specific objectives built up a long term cooperation relationship.(3)Pros and Cons:Increase efficiency, lower cost and enhance the teams’ cohesion. Brainstorming together and solve the problems; Overdependence would be difficult to reach a consensus or even conflicts may appear.
Research suggestions(1)Improve organizations’ management:Develop the source of funding for organizing the event, improve the coordination between volunteers and make transformation when in need.(2)Cooperation partnerships:Proactively build up a network, respect and trust both parties for long term cooperation.
|
author2 |
LIAO, CHUN-SUNG |
author_facet |
LIAO, CHUN-SUNG LIN, KUN-PIN 林坤濱 |
author |
LIN, KUN-PIN 林坤濱 |
spellingShingle |
LIN, KUN-PIN 林坤濱 A Study of Public-Private Cooperation:The Case of “Puli Power Party Marathon” |
author_sort |
LIN, KUN-PIN |
title |
A Study of Public-Private Cooperation:The Case of “Puli Power Party Marathon” |
title_short |
A Study of Public-Private Cooperation:The Case of “Puli Power Party Marathon” |
title_full |
A Study of Public-Private Cooperation:The Case of “Puli Power Party Marathon” |
title_fullStr |
A Study of Public-Private Cooperation:The Case of “Puli Power Party Marathon” |
title_full_unstemmed |
A Study of Public-Private Cooperation:The Case of “Puli Power Party Marathon” |
title_sort |
study of public-private cooperation:the case of “puli power party marathon” |
publishDate |
2018 |
url |
http://ndltd.ncl.edu.tw/handle/9ac8yw |
work_keys_str_mv |
AT linkunpin astudyofpublicprivatecooperationthecaseofpulipowerpartymarathon AT línkūnbīn astudyofpublicprivatecooperationthecaseofpulipowerpartymarathon AT linkunpin gōngsībùménxiélìhézuòzhīyánjiūyǐbùlǐpǎopulipowershānchéngpàiduìmǎlāsōngwèilì AT línkūnbīn gōngsībùménxiélìhézuòzhīyánjiūyǐbùlǐpǎopulipowershānchéngpàiduìmǎlāsōngwèilì AT linkunpin studyofpublicprivatecooperationthecaseofpulipowerpartymarathon AT línkūnbīn studyofpublicprivatecooperationthecaseofpulipowerpartymarathon |
_version_ |
1719168563113099264 |