Mathematical Model for the Financial Assessment of Taiwan High Speed Rail Build-Operate-Transfer(BOT) Project
碩士 === 國立成功大學 === 數學系應用數學碩博士班 === 106
Main Authors: | Pei-YinWu, 吳佩穎 |
---|---|
Other Authors: | Ruey-Lin Sheu |
Format: | Others |
Language: | zh-TW |
Published: |
2018
|
Online Access: | http://ndltd.ncl.edu.tw/handle/suyt7g |
Similar Items
-
Abandonment Option in Taiwan North-South Build-Operate-Transfer (BOT) High-Speed Rail Project
by: Chieh-Lin Chan, et al.
Published: (1999) -
The Financial Operation of BOT Special Project – Case Study with Taiwan High Speed Rail Project
by: Ling-Ju Chang, et al.
Published: (2011) -
The Operating Performance of BOT Project —A Case Study of Taiwan High Speed Rail
by: LU,JI-YIN, et al.
Published: (2017) -
BOT Project Financing and Financial Solvency Analysis: A Review of the Taiwan High Speed Rail Company's Funding Programs.
by: Tsui-lan Hu, et al.
Published: (2008) -
Analysis Of Optimum Capital Structure Of BOT Projects - The Case Study Of Taiwan High Speed Rail Project
by: King-long Wang, et al.
Published: (2008)