A Study on Applying System Simulation and DBR Technology to Manufacturing Process Improvement
碩士 === 國立勤益科技大學 === 工業工程與管理系 === 106 === This research applies system simulation technology and Theory of Constraint (TOC) to the improvement of the precision locknuts production system. In this research, the current manufacturing processes are analyzed and the simulation model is established so as...
Main Authors: | LIN,YAN-TING, 林彥廷 |
---|---|
Other Authors: | Dr. Liao, Li-Man |
Format: | Others |
Language: | zh-TW |
Published: |
2018
|
Online Access: | http://ndltd.ncl.edu.tw/handle/3972t3 |
Similar Items
-
A Feasibility Research on the S-DBR Applied to Manufacturing with Reentrant Flow
by: CHUN-SHUN WANG, et al.
Published: (2007) -
Apply DBR to improve the bottleneck problem of a production line
by: Kuo-Jen Tsai, et al.
Published: (2004) -
The effects of applying S-DBR with different of dispatching rules
by: 賴雲祥
Published: (2014) -
Apply DBR to semiconductor packaging planning production scheduling-use wire bonders as an example
by: Lin Zhong Ting, et al.
Published: (2015) -
Advanced Planning and Scheduling in Job Shop with Multi-DBR
by: Jun-Tin Lin, et al.
Published: (2008)