Earthwork Transport Optimization-A Case Study as an Example

碩士 === 國立中興大學 === 土木工程學系所 === 106 === In civil engineering, a completion of a project is made by a stream of several pieces of details. Furthermore, working items and orders are important factors in a construction costs, however, many sub-project operations are mainly arranged by their experiences,...

Full description

Bibliographic Details
Main Authors: Shun-Chao Yang, 楊順兆
Other Authors: 謝孟勳
Format: Others
Language:zh-TW
Published: 2018
Online Access:http://ndltd.ncl.edu.tw/handle/u56ysd
id ndltd-TW-106NCHU5015007
record_format oai_dc
spelling ndltd-TW-106NCHU50150072019-05-16T00:08:24Z http://ndltd.ncl.edu.tw/handle/u56ysd Earthwork Transport Optimization-A Case Study as an Example 土石方搬運最佳化 - 以重劃區整地工程為例 Shun-Chao Yang 楊順兆 碩士 國立中興大學 土木工程學系所 106 In civil engineering, a completion of a project is made by a stream of several pieces of details. Furthermore, working items and orders are important factors in a construction costs, however, many sub-project operations are mainly arranged by their experiences, including working items and working orders. Nowadays, government tenders are always in the minimum standard prices in Taiwan, and it led the results of minimum the project costs in each constructors considerations. This study is aimed to optimize the earthwork transportation, and a common earthwork project is including excavation, loading, backfill operations, leveling, transport operations and so on. However, contractors always subcontract the project of excavation and transport operations to others in general reconstruction projects. Generally, a reconstructing area is always divided into several parts, and one part is divided into several field lots. These field lots could be excavated or backfilled, and the transportation costs are always estimated by experiences. Yet the real costs is not easy to calculate. A reconstruction area is as an example in this study to build a linear programming model. The first step is to absorb the essential information in the project plan, then collect the data and construct the mathematical model which was written by Python language. Moreover, the objective function is to minimum the transportation costs in the minimum period. And the results shows that by using this model, compare to the traditional methods, the transportation costs can be saved up to 54.55%. 謝孟勳 2018 學位論文 ; thesis 65 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立中興大學 === 土木工程學系所 === 106 === In civil engineering, a completion of a project is made by a stream of several pieces of details. Furthermore, working items and orders are important factors in a construction costs, however, many sub-project operations are mainly arranged by their experiences, including working items and working orders. Nowadays, government tenders are always in the minimum standard prices in Taiwan, and it led the results of minimum the project costs in each constructors considerations. This study is aimed to optimize the earthwork transportation, and a common earthwork project is including excavation, loading, backfill operations, leveling, transport operations and so on. However, contractors always subcontract the project of excavation and transport operations to others in general reconstruction projects. Generally, a reconstructing area is always divided into several parts, and one part is divided into several field lots. These field lots could be excavated or backfilled, and the transportation costs are always estimated by experiences. Yet the real costs is not easy to calculate. A reconstruction area is as an example in this study to build a linear programming model. The first step is to absorb the essential information in the project plan, then collect the data and construct the mathematical model which was written by Python language. Moreover, the objective function is to minimum the transportation costs in the minimum period. And the results shows that by using this model, compare to the traditional methods, the transportation costs can be saved up to 54.55%.
author2 謝孟勳
author_facet 謝孟勳
Shun-Chao Yang
楊順兆
author Shun-Chao Yang
楊順兆
spellingShingle Shun-Chao Yang
楊順兆
Earthwork Transport Optimization-A Case Study as an Example
author_sort Shun-Chao Yang
title Earthwork Transport Optimization-A Case Study as an Example
title_short Earthwork Transport Optimization-A Case Study as an Example
title_full Earthwork Transport Optimization-A Case Study as an Example
title_fullStr Earthwork Transport Optimization-A Case Study as an Example
title_full_unstemmed Earthwork Transport Optimization-A Case Study as an Example
title_sort earthwork transport optimization-a case study as an example
publishDate 2018
url http://ndltd.ncl.edu.tw/handle/u56ysd
work_keys_str_mv AT shunchaoyang earthworktransportoptimizationacasestudyasanexample
AT yángshùnzhào earthworktransportoptimizationacasestudyasanexample
AT shunchaoyang tǔshífāngbānyùnzuìjiāhuàyǐzhònghuàqūzhěngdegōngchéngwèilì
AT yángshùnzhào tǔshífāngbānyùnzuìjiāhuàyǐzhònghuàqūzhěngdegōngchéngwèilì
_version_ 1719162408507801600