A study on the types of fire-proof packing and construction method of fire-prevention zoning for assembled residences

碩士 === 華夏科技大學 === 資產與物業管理系碩士在職專班 === 106 === Summary In recent years, the world has been a serious fire, in the process of economic growth, China's economic development has led to high-rise buildings, industrial and commercial development, rapid changes in the social model environment, promptin...

Full description

Bibliographic Details
Main Authors: HAO,WUN-CYUAN, 郝文全
Other Authors: Chen Jianmou
Format: Others
Language:zh-TW
Published: 2018
Online Access:http://ndltd.ncl.edu.tw/handle/93dp8b
id ndltd-TW-106HWH01457003
record_format oai_dc
spelling ndltd-TW-106HWH014570032019-05-16T00:15:32Z http://ndltd.ncl.edu.tw/handle/93dp8b A study on the types of fire-proof packing and construction method of fire-prevention zoning for assembled residences 集合住宅防火區劃貫穿管件防火填塞種類及施工法配套之研究 HAO,WUN-CYUAN 郝文全 碩士 華夏科技大學 資產與物業管理系碩士在職專班 106 Summary In recent years, the world has been a serious fire, in the process of economic growth, China's economic development has led to high-rise buildings, industrial and commercial development, rapid changes in the social model environment, prompting a surge in emerging industries, but also changed its operating patterns, the use of building use forms of diversification, but also the more complex, Underground buildings, large shopping malls, composite buildings (residential, commercial), electronic workshop office building more and more. The various types of buildings in the pipeline through the floor, often caused by arbitrary damage to the fire zoning or indoor decoration changes improper, easy to cause fire spread burning. May 12, 1990, the new Bei Hsichih Oriental Science Park, the fire, fire 43 hours to extinguish, resulting in more than 13 billion of the financial losses. Set the record for the longest fire in Taiwan over the years, while also burning a series of high-rise building const. Although the fire law has clearly stipulated that all types of pipelines run through the floor must implement fire-proof packing construction, but most construction plants or builders may not be clear about the relevant works law, so most of the cases still do not carry out the fire prevention packing construction according to law, so this research will discuss the fire prevention zoning through the Provide a reference for the construction plant or the building contractor to carry out the fire prevention packing. The purpose of this study is to explore the construction method of the fireproof packing material engineering of the metal pipe, plastic pipe and complex pipeline running through floor or wall. The difference between the structure of the wall and the material of the floor piping and the fire-retardant material is analyzed. The result of this study is that the fire-proof packing has better effect on the main fireproof material, such as rock wool and fireproof mud, fireproof packing for metal pipes, plastic pipes and complex pipelines running through floors or walls this study concludes that the metal pipe runs through the concrete slab, the metal pipe runs through the concrete wall, the metal pipe runs through the light compartment wall, the plastic pipe runs through the concrete floor , the plastic pipe runs through the concrete wall, the plastic pipe runs through the light compartment wall, the complex pipe runs through the concrete floor, the complex pipeline runs through the concrete wall surface, the complex pipeline runs through nine types of fire-proof packing, such as light compartment wall, which correspond to the rock wool density and the rock wool thickness variation combination. Key words: Fire zoning, fireproof packing material, construction method Chen Jianmou Chen Liru 陳建謀 陳俐茹 2018 學位論文 ; thesis 122 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 華夏科技大學 === 資產與物業管理系碩士在職專班 === 106 === Summary In recent years, the world has been a serious fire, in the process of economic growth, China's economic development has led to high-rise buildings, industrial and commercial development, rapid changes in the social model environment, prompting a surge in emerging industries, but also changed its operating patterns, the use of building use forms of diversification, but also the more complex, Underground buildings, large shopping malls, composite buildings (residential, commercial), electronic workshop office building more and more. The various types of buildings in the pipeline through the floor, often caused by arbitrary damage to the fire zoning or indoor decoration changes improper, easy to cause fire spread burning. May 12, 1990, the new Bei Hsichih Oriental Science Park, the fire, fire 43 hours to extinguish, resulting in more than 13 billion of the financial losses. Set the record for the longest fire in Taiwan over the years, while also burning a series of high-rise building const. Although the fire law has clearly stipulated that all types of pipelines run through the floor must implement fire-proof packing construction, but most construction plants or builders may not be clear about the relevant works law, so most of the cases still do not carry out the fire prevention packing construction according to law, so this research will discuss the fire prevention zoning through the Provide a reference for the construction plant or the building contractor to carry out the fire prevention packing. The purpose of this study is to explore the construction method of the fireproof packing material engineering of the metal pipe, plastic pipe and complex pipeline running through floor or wall. The difference between the structure of the wall and the material of the floor piping and the fire-retardant material is analyzed. The result of this study is that the fire-proof packing has better effect on the main fireproof material, such as rock wool and fireproof mud, fireproof packing for metal pipes, plastic pipes and complex pipelines running through floors or walls this study concludes that the metal pipe runs through the concrete slab, the metal pipe runs through the concrete wall, the metal pipe runs through the light compartment wall, the plastic pipe runs through the concrete floor , the plastic pipe runs through the concrete wall, the plastic pipe runs through the light compartment wall, the complex pipe runs through the concrete floor, the complex pipeline runs through the concrete wall surface, the complex pipeline runs through nine types of fire-proof packing, such as light compartment wall, which correspond to the rock wool density and the rock wool thickness variation combination. Key words: Fire zoning, fireproof packing material, construction method
author2 Chen Jianmou
author_facet Chen Jianmou
HAO,WUN-CYUAN
郝文全
author HAO,WUN-CYUAN
郝文全
spellingShingle HAO,WUN-CYUAN
郝文全
A study on the types of fire-proof packing and construction method of fire-prevention zoning for assembled residences
author_sort HAO,WUN-CYUAN
title A study on the types of fire-proof packing and construction method of fire-prevention zoning for assembled residences
title_short A study on the types of fire-proof packing and construction method of fire-prevention zoning for assembled residences
title_full A study on the types of fire-proof packing and construction method of fire-prevention zoning for assembled residences
title_fullStr A study on the types of fire-proof packing and construction method of fire-prevention zoning for assembled residences
title_full_unstemmed A study on the types of fire-proof packing and construction method of fire-prevention zoning for assembled residences
title_sort study on the types of fire-proof packing and construction method of fire-prevention zoning for assembled residences
publishDate 2018
url http://ndltd.ncl.edu.tw/handle/93dp8b
work_keys_str_mv AT haowuncyuan astudyonthetypesoffireproofpackingandconstructionmethodoffirepreventionzoningforassembledresidences
AT hǎowénquán astudyonthetypesoffireproofpackingandconstructionmethodoffirepreventionzoningforassembledresidences
AT haowuncyuan jíhézhùzháifánghuǒqūhuàguànchuānguǎnjiànfánghuǒtiánsāizhǒnglèijíshīgōngfǎpèitàozhīyánjiū
AT hǎowénquán jíhézhùzháifánghuǒqūhuàguànchuānguǎnjiànfánghuǒtiánsāizhǒnglèijíshīgōngfǎpèitàozhīyánjiū
AT haowuncyuan studyonthetypesoffireproofpackingandconstructionmethodoffirepreventionzoningforassembledresidences
AT hǎowénquán studyonthetypesoffireproofpackingandconstructionmethodoffirepreventionzoningforassembledresidences
_version_ 1719162888670674944